Independent thinking. Informed defence.

CISO Times

Intelligence for the people behind the defence.

The CISO Decision Brief

DORA Readiness Self-Assessment

Counts readiness across governance, ICT risk, incidents, testing and third-party risk, and names the blocking gaps. It gives no score.

Available soon

Answer it online instead: How ready are we for DORA?About 30 minutes, free, and nothing is stored.

Format
Excel
Size
84 KB
Length
11 sheets
Version
1.3
Updated

What's inside

What changed

  1. 1.3

    The mappings note no longer says the CISO Times Library shows a verification state; it says what a mapping shows and to confirm it against both texts.

  2. 1.2

    IM-01 and IM-02's "Operating when" no longer print an internal code name; they name the incident checks.

  3. 1.1

    A financial entity that sells ICT services is also a supplier, and any Priority 1 gap goes to the chair route.

Earlier versions (1)
  1. 1.0

    Published.

Changes across this pack

Preview

The workbook's sheets as you will receive them, with its example rows and the values its formulas calculate. Highlighted [[text]] is for you to replace; rows marked EXAMPLE are for you to delete. Wide sheets scroll sideways. The cover, document control and changelog sheets are in the file.

Instructions

How to use this workbook

StepWhat to do
1Do this first: complete the DORA Proportionality & Scope Assessment. Enter its four answers on the Scope Profile sheet: the entity type, the framework, microenterprise status and TLPT identification. The workbook then marks each requirement and each item as applying or not, and says why not. Do not mark an item Not applicable yourself because it is hard or costly (DR-03).
2On the Results sheet, enter the date of this assessment, the date of the next meeting of the management body and who rated the items. Assess at least every 6 months, and whenever the profile, the register or a critical or important contract changes (DR-18).
3On the Assessment sheet, choose a readiness level for each item that applies. Read the 'Operating when' column first: an item is Operating only when it meets all of it and a supervisor could sample the records. When in doubt, choose the lower level.
4Record the evidence you looked at, or the fact that decides the level. Open the document or the record; do not rely on what people say.
5For every item below Operating, say what is missing, name one owner, and estimate the effort: Small, under [[2]] weeks of work, inside one team, within budget. Medium, [[2]] to [[8]] weeks, or two or more teams, within budget. Large, more than [[8]] weeks, or money the budget does not hold. Add a plan date if a plan already sets an earlier date than the latest one. The Check column prompts for anything missing.
6Read the Results sheet: the result, the blocking gaps, the counts by area, and every gap in priority order. Take each blocking gap to the management body (DR-05). The sheet gives the date. Read the Sequence sheet to see where to work first (DR-02).
7Copy every gap into the DORA Gap & Remediation Tracker, with its owner, effort and priority (DR-06). Keep a copy of each assessment: a supervisor may ask for it.

Legend

Yellow cells are inputs. Everything else is calculated or fixed — do not overwrite formulas.

EXAMPLERows marked EXAMPLE in the first column show how a completed row looks. Delete them before approval.

Limitations: This document helps you see what DORA asks of an entity like yours and what you can show. It is not legal advice, and following it is not a statement that you comply with DORA or any standard. Whether DORA binds you, and which of its duties apply to you, depends on what you are, how you are authorised and how your Member State and your supervisor apply it: confirm it with counsel or your competent authority.

What this workbook does not do. This workbook does not say which ISO/IEC 27001 controls or NIST CSF outcomes meet a DORA requirement. It gives each article's own words, what an entity must be able to show, and the CISO Times documents that help with the work. Where the CISO Times Library holds a mapping between a DORA requirement and a control, it shows it there with how closely the two match and where they differ; confirm it against both texts before relying on it. A document listed here helps with the work a requirement describes. Using it does not by itself show that the requirement is met.

The idea behind it. DORA is one regulation with five pillars: ICT risk management, ICT-related incident management and reporting, digital operational resilience testing, the management of ICT third-party risk, and information sharing. Every financial entity meets the same five pillars, and the depth of each depends on what the entity is. A microenterprise, a small investment firm, an exempted payment institution and a large bank each owe a different part of each pillar, and the Regulation says which. So the first question is what you are, the second is which duties that makes yours, and only then is it worth asking how ready you are. Being ready is a count of duties in place and duties still open. It is never one score.

The readiness levels:

Not started: Nothing exists yet.

Planned: Owner and approach agreed; not yet in place.

In place: Documented and working, but incomplete, short of its own target, or with too little record for a supervisor to sample.

Operating: Working in full and meeting its own target, with records a supervisor could sample.

Not applicable: The duty does not apply to the entity. The reason must be recorded, and confirmed with counsel. It counts neither for nor against the result.

Blocking gaps. A readiness item that is binding on this entity type (its requirements apply to the entity and are duties, not options) and is rated below In place. A blocking gap is a duty that is not in place at all. The Scope Profile sheet works out which items bind your entity. Every blocking gap is entered in the gap tracker as Priority 1 on the day it is found (DR-05).

The result. Not ready: at least one blocking gap, a binding duty rated below In place. Ready, with actions: no blocking gap, but some applicable items are below Operating. Ready: every applicable item is Operating, and each item that does not apply has its reason recorded. The result is one of three words with the counts beside it. It is never a score or a share. Until every item that applies has a level, the result reads Incomplete.

The rules this workbook applies: DR-03, DR-04, DR-05 ("A blocking gap is a readiness item that is binding on your entity type and is rated below In place. Every blocking gap is entered in the gap tracker as Priority 1 on the day it is found. It goes to the management body at its next meeting. If that meeting is more than [[10]] working days away, the DORA programme lead tells its chair within that time. Any other gap rated Priority 1 follows the same route, whatever its source.") and DR-06. The gap priorities and their days are in the Definitions sheet. The other rules are in the pack's documents.

EXAMPLE: Lantern Pay Services (EXAMPLE) is a small authorised payment institution in an EU Member State, with 64 staff, giving payment services for online merchants. DORA applied from 17 Jan 2025. Lantern Pay's board approved its scope assessment on 21 Nov 2024: a payment institution, authorised and not exempted, so under the full framework, and with 64 staff not a microenterprise. The board approved the ICT risk management framework and its yearly review report on 12 Mar 2026, and the ICT third-party strategy and policy on 10 Jun 2026. It submitted its register of information on 27 Mar 2026, in the format its authority set. The DORA programme lead ran the first readiness self-assessment as at 30 Sep 2026. 8 of 19 applicable items are below Operating, 2 of them blocking: the contract amendment for the payment platform, and its exit plan.

If you are a supplier to a financial entity. You are not a financial entity, so you do not run this assessment (DR-22). DORA lists ICT third-party service providers in Article 2(1), point (u), and defines financial entities as points (a) to (t) only. Its duties for the contract fall on the financial entity. A supplier is reached by DORA mainly through the terms its customers must ask for (the supplier flow-down list) and the information they must collect. A supplier designated as critical is also overseen by a Lead Overseer. Check your contracts against the 10 items of the flow-down list in the DORA Proportionality & Scope Assessment.

Adapting this template

Article 16 entity or microenterprise: choose the framework and microenterprise answer on the Scope Profile sheet. Items that do not apply drop out of the counts with their reason, and items that apply only to you appear.

Group: these sheets work at the level of one entity. A group keeps the register of information at sub-consolidated and consolidated level as well, and takes advice on that (DR-23).

National law or your authority's instructions: add each extra duty on the blank rows at the foot of the Assessment sheet, with an ID, an area and the requirement. A row you add counts as a binding duty that applies.

ICT run by a service provider: rate an item on what you can show, not on what the provider says. The owner is the person who manages the provider.

This workbook is your own record. Keep it with the evidence it rests on.

Scope Profile

Scope profile

Your four answers from the DORA Proportionality & Scope Assessment decide which requirements and items apply to you, which bind you, and why the others do not. Yellow cells are yours. The tables below calculate from them and read the facts of the pack (DR-01, DR-03).

Your profile

FieldYour answerNotes
Entity type (DORA Article 2(1))Payment institution (including an exempted payment institution)The entity type from the scope assessment. DORA Article 2(1), points (a) to (t), lists them. EXAMPLE: Lantern Pay Services (EXAMPLE).
FrameworkFull ICT risk management framework (DORA Articles 5 to 15)The framework the scope assessment found: full (Articles 5 to 15) or simplified (Article 16). An entity that is out of scope, or is a supplier, does not use this workbook (DR-22).
Microenterprise (Article 3(60))?NoYes only if the scope assessment found a microenterprise (Article 3(60)). A central securities depository, central counterparty, trading venue or trade repository is never one, and the workbook ignores Yes for them.
Identified by a TLPT authority (Article 26)?NoYes only if a threat-led penetration testing authority has identified the entity. The workbook ignores Yes for an Article 16 entity or a microenterprise (Article 26(1)).
Scope assessment approved on21 Nov 2024The date the management body approved the scope assessment (DR-01).
Scope assessment last reviewed on4 Mar 2026The date of the latest review of the scope assessment (DR-01).
Your profile in one linePayment institution (including an exempted payment institution); Full ICT risk management framework (DORA Articles 5 to 15)
CheckOK
Profile complete (working)Yes
Entity type ID (working)payment
Full framework (working)1
Simplified framework (working)0
Microenterprise (working)0
TLPT authority has identified the entity (working)0

Each requirement, read from your profile

RequirementArticleApplies toDuty or optionApplies to you?Why it does notTypes (working)
RQ-01 Know whether DORA binds youArticle 2(1), (3), (4)Every financial entity in scopeDutyYes
RQ-02 Apply the rules in proportionArticle 4Every financial entity in scopeDutyYes
RQ-03 Run the simplified frameworkArticle 16(1)(a) to (d); Delegated Regulation 2024/1774 Articles 29 to 38Entities under the simplified framework (Article 16)DutyNoFor entities under the simplified framework: the entity follows Articles 5 to 15
RQ-04 The management body owns ICT riskArticle 5(1), (2)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-05 Reporting channels to the management bodyArticle 5(2)(i)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-06 Members keep their ICT knowledge currentArticle 5(4)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-07 A documented ICT risk management frameworkArticle 6(1) to (3)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-08 Control function, three lines and ICT auditArticle 6(4), (6), (7)Entities under the full framework, other than microenterprisesDutyYes
RQ-09 Review the framework every year and report on itArticle 6(5)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-10 A digital operational resilience strategyArticle 6(8)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-11 Reliable, resilient systemsArticle 7Entities under the full framework (not the Article 16 entities)DutyYes
RQ-12 Know your functions, assets and dependenciesArticle 8(1), (2), (4) to (6)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-13 Risk assessments on change and on legacy systemsArticle 8(3), (7)Entities under the full framework, other than microenterprisesDutyYes
RQ-14 Protection and preventionArticle 9Entities under the full framework (not the Article 16 entities)DutyYes
RQ-15 DetectionArticle 10Entities under the full framework (not the Article 16 entities)DutyYes
RQ-16 Continuity policy, response and recovery plansArticle 11(1) to (5), (8)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-17 Test the plans at least yearlyArticle 11(6)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-18 A crisis management functionArticle 11(7)Entities under the full framework, other than microenterprisesDutyYes
RQ-19 Backup, restoration and recoveryArticle 12Entities under the full framework (not the Article 16 entities)DutyYes
RQ-20 Learn from incidents and testsArticle 13(1) to (3), (5)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-21 Awareness and resilience training for all staffArticle 13(6)Entities under the full framework (not the Article 16 entities)DutyYes
RQ-22 Crisis communicationArticle 14Entities under the full framework (not the Article 16 entities)DutyYes
RQ-23 Key dependencies and critical functionsArticle 16(1)(e); Delegated Regulation 2024/1774 Article 30Entities under the simplified framework (Article 16)DutyNoFor entities under the simplified framework: the entity follows Articles 5 to 15
RQ-24 Continuity, backup and restoration, and their testsArticle 16(1)(f), (g); Delegated Regulation 2024/1774 Articles 39 and 40Entities under the simplified framework (Article 16)DutyNoFor entities under the simplified framework: the entity follows Articles 5 to 15
RQ-25 Lessons, training and the review reportArticle 16(1)(h), 16(2); Delegated Regulation 2024/1774 Article 41Entities under the simplified framework (Article 16)DutyNoFor entities under the simplified framework: the entity follows Articles 5 to 15
RQ-26 Governance under the simplified frameworkDelegated Regulation 2024/1774 Article 28Entities under the simplified framework (Article 16)DutyNoFor entities under the simplified framework: the entity follows Articles 5 to 15
RQ-27 An incident management processArticle 17Every financial entity in scopeDutyYes
RQ-28 Classify incidents by the criteriaArticle 18; Delegated Regulation 2024/1772Every financial entity in scopeDutyYes
RQ-29 Report major incidents on timeArticle 19(1), (3), (4)Every financial entity in scopeDutyYes
RQ-30 Significant cyber threats (optional)Article 19(2)Every financial entity in scopeOptionYes
RQ-31 Payment-related incidentsArticle 23Every financial entity in scope; credit institution, payment institution (including an exempted payment institution), account information service provider, electronic money institution (including an exempted one) onlyDutyYes|credit|payment|aisp|emoney|
RQ-32 A resilience testing programmeArticle 24(1) to (5)Every financial entity in scope other than microenterprisesDutyYes
RQ-33 Test the systems behind critical functions every yearArticle 24(6)Every financial entity in scope other than microenterprisesDutyYes
RQ-34 A range of testsArticle 25(1)Every financial entity in scopeDutyYes
RQ-35 Microenterprises: risk-based testingArticle 25(3)MicroenterprisesDutyNoFor microenterprises only
RQ-36 Vulnerability assessments before deploymentArticle 25(2)Every financial entity in scope; central securities depository, central counterparty onlyDutyNoFor central securities depository, central counterparty only|csd|ccp|
RQ-37 Threat-led penetration testing (if identified)Article 26(1) to (3), (8)Entities that a TLPT authority has identifiedDutyNoA TLPT authority has not identified the entity
RQ-38 TLPT closure, remediation and attestationArticle 26(6), (7); Delegated Regulation 2025/1190 Articles 12 and 13Entities that a TLPT authority has identifiedDutyNoA TLPT authority has not identified the entity
RQ-39 Testers for TLPTArticle 27Entities that a TLPT authority has identifiedDutyNoA TLPT authority has not identified the entity
RQ-40 ICT security testing under the simplified frameworkArticle 16(1)(g); Delegated Regulation 2024/1774 Article 36Entities under the simplified framework (Article 16)DutyNoFor entities under the simplified framework: the entity follows Articles 5 to 15
RQ-41 You stay responsibleArticle 28(1)Every financial entity in scopeDutyYes
RQ-42 The register of informationArticle 28(3); Implementing Regulation 2024/2956Every financial entity in scopeDutyYes
RQ-43 Report on the register and tell the authority firstArticle 28(3), third to fifth subparagraphsEvery financial entity in scopeDutyYes
RQ-44 A third-party risk strategy and a policyArticle 28(2); Delegated Regulation 2024/1773Entities under the full framework, other than microenterprisesDutyYes
RQ-45 A role to monitor the arrangementsArticle 5(3)Entities under the full framework, other than microenterprisesDutyYes
RQ-46 Assess before you contract, then auditArticle 28(4) to (6); Article 29(1)Every financial entity in scopeDutyYes
RQ-47 Contract terms for every arrangementArticle 30(1), (2)Every financial entity in scopeDutyYes
RQ-48 More terms for critical or important functionsArticle 30(3)Every financial entity in scopeDutyYes
RQ-49 Exit plans and the right to end the contractArticle 28(7), (8)Every financial entity in scopeDutyYes
RQ-50 Subcontracting of critical or important servicesArticle 29(2); Delegated Regulation 2025/532Every financial entity in scopeDutyYes
RQ-51 Know whether a provider is designated as criticalArticles 31 and 28(3)Every financial entity in scopeDutyYes
RQ-52 Information sharing (optional)Article 45Every financial entity in scopeOptionYes
A requirement that does not apply is never marked so because it is hard or costly. The reason comes from the text of the Regulation (DR-03). The requirement catalogue, with what each asks and what to show, is in the DORA Article-to-Control Mapping Library.

Each readiness item, read from the requirements (working)

ItemApplies to you?Why it does notBinding duty?Reasons so far 1Reasons so far 2Reasons so far 3Reasons so far 4Reasons so far 5
SC-01YesYes
RM-01YesYesFor entities under the simplified framework: the entity follows Articles 5 to 15
RM-02YesYesFor entities under the simplified framework: the entity follows Articles 5 to 15For entities under the simplified framework: the entity follows Articles 5 to 15For entities under the simplified framework: the entity follows Articles 5 to 15For entities under the simplified framework: the entity follows Articles 5 to 15For entities under the simplified framework: the entity follows Articles 5 to 15
RM-03YesYes
RM-04YesYesFor entities under the simplified framework: the entity follows Articles 5 to 15
RM-05YesYes
RM-06YesYesFor entities under the simplified framework: the entity follows Articles 5 to 15
RM-07YesYes
IM-01YesYes
IM-02YesYes
RT-01YesYesFor microenterprises onlyFor microenterprises only; For central securities depository, central counterparty onlyFor microenterprises only; For central securities depository, central counterparty only; For entities under the simplified framework: the entity follows Articles 5 to 15
RT-02YesYes
RT-03NoA TLPT authority has not identified the entityNoA TLPT authority has not identified the entityA TLPT authority has not identified the entityA TLPT authority has not identified the entity
TP-01YesYes
TP-02YesYes
TP-03YesYes
TP-04YesYes
TP-05YesYes
IS-01YesNo
SV-01YesNo

Assessment

One row per readiness item. Yellow columns are yours; the columns to the right of Plan date calculate. Rate each item that applies against its 'Operating when' column.

ExampleItem IDAreaReadiness itemRequirementsDORA textOperating whenApplies to you?Binding duty?Readiness levelEvidence and facts (reason, if not applicable)What is missing (below Operating)Gap owner (one role)EffortPlan date (if earlier than the latest)Level countedBlocking gap?Gap priorityLatest due dateDueCheckWhy it does not applyOrder (working)Blocking gaps so far (working)
EXAMPLESC-01Scope and proportionalityScope, profile and proportionality decided and recordedRQ-01, RQ-02Article 2(1), (3), (4); Article 4The written assessment gives the entity type, any exclusion, the framework, microenterprise status and TLPT identification, each with its source. The management body approved it and counsel confirmed it, and it was reviewed in the last 12 months or since the last trigger (DR-01).YesYesOperatingScope assessment approved by the board on 21 Nov 2024 and reviewed on 4 Mar 2026; confirmed by counsel; no trigger since.OperatingNoNoneOK
EXAMPLERM-01ICT risk managementThe management body governs ICT riskRQ-04, RQ-05, RQ-06, RQ-26Article 5(1), (2); Article 5(2)(i); Article 5(4); Delegated Regulation 2024/1774 Article 28Minutes show the management body approving the framework, strategy, risk tolerance, continuity plans, audit plans, third-party policy and budget (DR-07), regular reports reach it, and every member was trained in the last 12 months and every new member within 3 months.YesYesIn place4 of 5 members trained in the last 12 months; the member appointed on 15 Jul 2026 is booked for 8 Oct 2026, inside the 3 months.Non-executive director 2, appointed on 15 Jul 2026, is not yet trainedThe boardSmall8 Oct 2026In placeNoPriority 229 Dec 20268 Oct 2026OK2005
EXAMPLERM-02ICT risk managementThe ICT risk management framework is documented, approved and reviewedRQ-03, RQ-07, RQ-09, RQ-10, RQ-25Article 16(1)(a) to (d); Delegated Regulation 2024/1774 Articles 29 to 38; Article 6(1) to (3); Article 6(5); Article 6(8); Article 16(1)(h), 16(2); Delegated Regulation 2024/1774 Article 41The framework and the strategy are documented and approved, reviewed in the last 12 months and after each major incident, and the review report in the Regulation's format is ready for the authority.YesYesOperatingFramework, strategy and risk tolerance approved by the board on 12 Mar 2026, with the review report in the Regulation's format.OperatingNoNoneOK
EXAMPLERM-03ICT risk managementICT risk control, independence and auditRQ-08Article 6(4), (6), (7)A control function oversees ICT risk with enough independence, the three lines are separate, the framework is internally audited on a plan, and critical audit findings are followed up.YesYesOperatingThe second-line risk function oversees ICT risk; internal audit reviewed the framework in 2025 and its critical finding was closed.OperatingNoNoneOK
EXAMPLERM-04ICT risk managementFunctions, assets and dependencies identified and assessedRQ-12, RQ-13, RQ-23Article 8(1), (2), (4) to (6); Article 8(3), (7); Article 16(1)(e); Delegated Regulation 2024/1774 Article 30The inventories of functions, assets and dependencies are current and reviewed in the last 12 months, critical or important functions are marked, and risk assessments exist for each major change and each legacy system.YesYesIn placeInventories are current and reviewed. The legacy back-office reporting server (SYS-06) has no ICT risk assessment in the last 12 months.No ICT risk assessment in the last 12 months for the legacy reporting server (SYS-06)Head of Information SecuritySmall13 Nov 2026In placeNoPriority 229 Dec 202613 Nov 2026OK2008
EXAMPLERM-05ICT risk managementProtection, detection and resilient systemsRQ-11, RQ-14, RQ-15Article 7; Article 9; Article 10The information security policy and the access, authentication, change and patch policies operate with records, detection mechanisms and alert thresholds are defined and tested, and systems have the capacity they need.YesYesOperatingInformation security, access, authentication, change and patch policies operate with records; detection alerts are tested each quarter.OperatingNoNoneOK
EXAMPLERM-06ICT risk managementContinuity, backup and recovery planned and testedRQ-16, RQ-17, RQ-18, RQ-19, RQ-24Article 11(1) to (5), (8); Article 11(6); Article 11(7); Article 12; Article 16(1)(f), (g); Delegated Regulation 2024/1774 Articles 39 and 40The continuity policy, the plans and the business impact analysis are approved, the backup and restoration procedures are in use, and the plans were tested in the last 12 months with the deficiencies reported to the management body (DT-14).YesYesIn placeContinuity policy, plans and business impact analysis approved; the plan test for all functions was last run on 26 Aug 2025 and fell due on 26 Aug 2026. The crisis communication plan was tested on 24 Feb 2026.The test of the continuity, response and recovery plans for all functions was last run on 26 Aug 2025Head of Information SecurityMedium30 Oct 2026In placeNoPriority 229 Dec 202630 Oct 2026OK2010
EXAMPLERM-07ICT risk managementLearning, training and crisis communicationRQ-20, RQ-21, RQ-22Article 13(1) to (3), (5); Article 13(6); Article 14Post-incident reviews and test lessons feed the risk assessment, all staff have completed the compulsory training, and a crisis communication plan names the person who speaks for the entity.YesYesOperatingPost-incident reviews feed the risk register; all staff completed the compulsory module; a named person speaks for the entity in a crisis.OperatingNoNoneOK
EXAMPLEIM-01ICT-related incident management, classification and reportingIncidents managed, logged and classifiedRQ-27, RQ-28Article 17; Article 18; Delegated Regulation 2024/1772Every ICT-related incident and significant cyber threat is logged with its root cause, and every incident is classified against the criteria with the result recorded (incident checks IC-01 and IC-02).YesYesOperatingEvery incident is logged and classified against the criteria; the Q3 log has no major incident.OperatingNoNoneOK
EXAMPLEIM-02ICT-related incident management, classification and reportingMajor incidents can be reported on timeRQ-29, RQ-31Article 19(1), (3), (4); Article 23Authority, channel, templates, signatories and the client notice are ready, access was tested in the last 12 months, and reporting was rehearsed (incident checks IC-03 to IC-08; P18).YesYesIn placeAuthority, channel, templates and signatories are ready (P18). The signatories' access to the authority's channel was last tested on 2025-08-12, more than 12 months ago.The signatories' access to the authority's reporting channel was last tested on 12 Aug 2025Information Security ManagerSmall16 Oct 2026In placeNoPriority 229 Dec 202616 Oct 2026OK2013
EXAMPLERT-01Digital operational resilience testingA risk-based resilience testing programmeRQ-32, RQ-34, RQ-35, RQ-36, RQ-40Article 24(1) to (5); Article 25(1); Article 25(3); Article 25(2); Article 16(1)(g); Delegated Regulation 2024/1774 Article 36The programme is approved, covers a range of tests chosen on risk, uses independent testers, and has a procedure to prioritise, classify and remedy findings and to confirm closure.YesYesOperatingThe programme was approved on 2026-01-28, uses independent testers and has a finding register with validated closure.OperatingNoNoneOK
EXAMPLERT-02Digital operational resilience testingSystems behind critical or important functions tested every 12 monthsRQ-33Article 24(6)Every system and application that supports a critical or important function has a counting test within the last 12 months (DR-12).YesYesIn place4 of 5 systems behind the critical function have a counting test in the last 12 months; SYS-02 fell due on 29 Aug 2026.The settlement API gateway (SYS-02) was last tested on 29 Aug 2025Security Assurance LeadSmall23 Oct 2026In placeNoPriority 229 Dec 202623 Oct 2026OK2015
EXAMPLERT-03Digital operational resilience testingThreat-led penetration testing, if the entity is identifiedRQ-37, RQ-38, RQ-39Article 26(1) to (3), (8); Article 26(6), (7); Delegated Regulation 2025/1190 Articles 12 and 13; Article 27The TLPT authority's identification, the validated scope, the testers' qualifications, the summary report, the remediation plans and the attestation are on file (DR-16).NoNoNot applicableA TLPT authority has not identified the entityNot applicableNoNoneOKA TLPT authority has not identified the entity
EXAMPLETP-01Management of ICT third-party riskThe register of information is complete and validRQ-42, RQ-43Article 28(3); Implementing Regulation 2024/2956; Article 28(3), third to fifth subparagraphsEvery arrangement is in the register in the official templates, with no open data finding (RV-01 to RV-10), and the yearly report to the authority has been made in the form and by the date the authority set.YesYesIn place7 arrangements in the register, submitted on 27 Mar 2026; 1 open data finding (RV-03: the code of Hosting Subcontractor G).The register has no LEI or EUID for Hosting Subcontractor G, behind CA-001 (RV-03)Head of ProcurementSmall23 Oct 2026In placeNoPriority 229 Dec 202623 Oct 2026OK2017
EXAMPLETP-02Management of ICT third-party riskThird-party strategy, policy and monitoring roleRQ-41, RQ-44, RQ-45Article 28(1); Article 28(2); Delegated Regulation 2024/1773; Article 5(3)The strategy and the policy are approved by the management body in the last 12 months, and a role or senior manager monitors the arrangements and reports to the management body.YesYesOperatingStrategy and policy approved by the board on 10 Jun 2026; the Head of Procurement is the designated manager.OperatingNoNoneOK
EXAMPLETP-03Management of ICT third-party riskAssessment before contracting, audit and concentrationRQ-46, RQ-51Article 28(4) to (6); Article 29(1); Articles 31 and 28(3)Each critical or important arrangement has a pre-contract assessment with due diligence and concentration risk, an audit plan set on risk, and a check of the provider against the ESAs' list.YesYesOperatingThe pre-contract assessment and concentration check for CA-001 are on file; the provider was checked against the ESAs' list on 2026-09-21.OperatingNoNoneOK
EXAMPLETP-04Management of ICT third-party riskContract terms in placeRQ-47, RQ-48Article 30(1), (2); Article 30(3)Every contract has the Article 30(1) and (2) terms, and every contract for a critical or important function also has the Article 30(3) terms, including audit and access rights and participation in TLPT.YesYesPlannedCA-001, signed in 2022, lacks the unrestricted audit and access wording and the TLPT participation term of Article 30(3). An amendment was drafted on 2026-09-12 and is not signed.The CA-001 contract lacks the Article 30(3) audit, access and TLPT termsGeneral CounselMediumPlannedYesPriority 130 Oct 202630 Oct 2026OK1020TP-04
EXAMPLETP-05Management of ICT third-party riskExit plans and subcontracting for critical or important arrangementsRQ-49, RQ-50Article 28(7), (8); Article 29(2); Delegated Regulation 2025/532Each such arrangement has an exit plan reviewed and tested in the last 12 months (DR-17), termination rights, and a subcontracting assessment with the conditions in the contract.YesYesPlannedCA-001 has no exit plan (B_07.01.0080 is No). The approach is agreed; the plan is not written. Hosting Subcontractor G has no LEI yet.No exit plan for CA-001, the one arrangement behind the critical functionHead of ProcurementLargePlannedYesPriority 130 Oct 202630 Oct 2026OK1021TP-04, TP-05
EXAMPLEIS-01Information sharingInformation sharing and threat notification: a decisionRQ-52, RQ-30Article 45; Article 19(2)The entity has decided whether to take part in a trusted information-sharing community and whether to notify significant cyber threats, and has recorded the decision and, if it takes part, told its authority.YesNoOperatingThe board decided on 10 Jun 2026 not to join an information-sharing community yet; the decision is recorded. Significant cyber threats are notified only on the incident manager's judgement (Article 19(2) is optional).OperatingNoNoneOKTP-04, TP-05
EXAMPLESV-01SupervisionEvidence ready for the competent authorityEvidence checklistEvidence checklist: every item that appliesEvery evidence item that applies has an owner and is ready, or its gap is in the tracker, so any item can be produced within 5 working days (DR-19).YesNoOperating25 of 33 evidence items ready; the 8 not fully ready are each behind a gap in the tracker.OperatingNoNoneOKTP-04, TP-05

Results

Results

The result, the blocking gaps, readiness by area and every gap in priority order, calculated from the Assessment sheet. Only the yellow settings are yours. Every figure is a count with names (DR-04).

EXAMPLE: Lantern Pay Services (EXAMPLE). Clear the EXAMPLE column and the yellow answers to use your own.

Settings

Date of this assessment30 Sep 2026EXAMPLE: the example assessment date. Due dates count from it (DR-06).
Next meeting of the management body22 Oct 2026Used for DR-05. EXAMPLE: the next board meeting.
Working days to tell the chair (DR-05)10The [[10]] in DR-05.
Months to the next assessment (DR-18)6The [[6]] in DR-18.
Assessed by (role)EXAMPLE: Head of ComplianceThe person who rated the items and checked the evidence.

The result

ResultNot readyNot ready: at least one blocking gap, a binding duty rated below In place. Ready, with actions: no blocking gap, but some applicable items are below Operating. Ready: every applicable item is Operating, and each item that does not apply has its reason recorded. The result is one of three words with the counts beside it. It is never a score or a share.
In one lineNot ready: 2 blocking gaps (TP-04, TP-05); 6 other items below Operating, out of 19 that apply.
Blocking gaps2TP-04, TP-05. Each is a Priority 1 gap: listed first below, with its effort.
Tell the management body (DR-05)To the chair by 2026-10-14: the next meeting, on 2026-10-22, is later than 10 working days.
Next assessment due (DR-18)30 Mar 2027Or sooner, when the profile, the register or a critical or important contract changes.

Readiness by area

AreaDORAItemsOperatingIn placePlannedNot startedNot applicableNot ratedResult: at OperatingBlocking gaps
Scope and proportionalityArticles 2, 4 and 1611000001 of 1 at Operating0
ICT risk managementChapter II, Articles 5 to 1674300004 of 7 at Operating0
ICT-related incident management, classification and reportingChapter III, Articles 17 to 2321100001 of 2 at Operating0
Digital operational resilience testingChapter IV, Articles 24 to 2731100101 of 2 at Operating0
Management of ICT third-party riskChapter V, Section I, Articles 28 to 3052120002 of 5 at Operating2
Information sharingChapter VI, Article 4511000001 of 1 at Operating0
SupervisionEvidence for the competent authority11000001 of 1 at Operating0
All areas20116201011 of 19 at Operating2
Read the counts, not a percentage. An item In place works but is incomplete, or has too little record to sample. An item without an Item ID is not counted. Not applicable items are left out of 'at Operating'. The Not applicable count includes the items your profile says do not apply.

Effort to close the gaps

EffortPriority 1 (blocking)Priority 2Priority 3All gapsWhat it means
Small0505Under [[2]] weeks of work, inside one team, within budget.
Medium1102[[2]] to [[8]] weeks, or two or more teams, within budget.
Large1001More than [[8]] weeks, or money the budget does not hold.
Not estimated0000Enter the effort on the Assessment sheet.
All gaps2608

Every gap, in priority order (copy into the gap tracker)

No.Item IDReadiness itemPriorityLevelWhat is missingOwnerEffortDueRow
1TP-04Contract terms in placePriority 1, blockingPlannedThe CA-001 contract lacks the Article 30(3) audit, access and TLPT termsGeneral CounselMedium30 Oct 202617
2TP-05Exit plans and subcontracting for critical or important arrangementsPriority 1, blockingPlannedNo exit plan for CA-001, the one arrangement behind the critical functionHead of ProcurementLarge30 Oct 202618
3RM-01The management body governs ICT riskPriority 2In placeNon-executive director 2, appointed on 15 Jul 2026, is not yet trainedThe boardSmall8 Oct 20262
4RM-04Functions, assets and dependencies identified and assessedPriority 2In placeNo ICT risk assessment in the last 12 months for the legacy reporting server (SYS-06)Head of Information SecuritySmall13 Nov 20265
5RM-06Continuity, backup and recovery planned and testedPriority 2In placeThe test of the continuity, response and recovery plans for all functions was last run on 26 Aug 2025Head of Information SecurityMedium30 Oct 20267
6IM-02Major incidents can be reported on timePriority 2In placeThe signatories' access to the authority's reporting channel was last tested on 12 Aug 2025Information Security ManagerSmall16 Oct 202610
7RT-02Systems behind critical or important functions tested every 12 monthsPriority 2In placeThe settlement API gateway (SYS-02) was last tested on 29 Aug 2025Security Assurance LeadSmall23 Oct 202612
8TP-01The register of information is complete and validPriority 2In placeThe register has no LEI or EUID for Hosting Subcontractor G, behind CA-001 (RV-03)Head of ProcurementSmall23 Oct 202614

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

Order: Priority 1 first, then Priority 2, then Priority 3; within a priority, in the order of the Assessment sheet. The grey Row column is the item's position in the assessment table. The due date is the latest date for the priority, or an earlier plan date (DR-06). The gap tracker follows each gap to closure.

Limitations

This is a self-assessment. It is as good as the evidence behind each level. A second person checking the levels of the binding items is the best defence against optimism.

It reads the text of DORA and its technical standards as they stood on 8 October 2026. It is not legal advice, and it does not check what your Member State or your competent authority adds. Confirm the profile and any Not applicable item with counsel.

A level of Operating on every item that applies makes it likely, not certain, that a supervisor would find the duties in place. How proportionate each measure is for your entity is a judgement that your risk assessment supports. This workbook does not make it.

Effort is an estimate in bands. Use it to plan and to ask for resources, not as a commitment.

The result is one of three words with the counts beside it. Never turn the counts into a percentage, a score or a traffic-light total (DR-04).

Sequence

Where to work first

The order a smaller financial entity should work in (DR-02), with the readiness items each step settles and where you stand on them now. Counts only, calculated from the Assessment sheet.

StepWhat to doWhy it comes hereRulesItemsItems at Operating, of those that applyBlocking gaps
S-1Decide what you areEvery other duty depends on the answer, and the scope assessment is short.DR-01, DR-031 of 1 at Operating0
S-2Put the management body in chargeDORA gives the management body the decisions and the responsibility, so the approvals in the later steps need it ready.DR-070 of 1 at Operating0
S-3List what you depend onThe functions, the assets and the register of ICT arrangements come first. Provider identifiers take weeks to collect.DR-08, DR-09, DR-100 of 2 at Operating0
S-4Write and approve the frameworkIt sets the risk tolerance, the continuity plans and the control functions that the tests and the contracts then use.DR-074 of 5 at Operating0
S-5Close the gaps in critical or important arrangementsThese are the duties a supervisor tests first: contract terms, exit plans and subcontracting.DR-11, DR-172 of 4 at Operating2
S-6Make classification and reporting ready and rehearsedA major incident starts a clock that does not wait for the programme.DR-151 of 2 at Operating0
S-7Plan and run the testsThe yearly tests need the list of critical or important systems from step 3.DR-12, DR-13, DR-14, DR-161 of 2 at Operating0
S-8Gather the evidence, review and reportEvidence is what is left to show once the work is done, and the cycle repeats.DR-18, DR-192 of 2 at Operating0

The eight incident checks behind IM-01 and IM-02

CheckWhat to be able to showP18 checksP18 rulesReporting duties (P18)
IC-01Every ICT-related incident is logged and classified against the criteria of Delegated Regulation 2024/1772, and the classification is recordedRC-01RN-02, RN-03None
IC-02The test for a major ICT-related incident is applied to each classification, and the result is recorded with the criteria metRC-01RN-03RD-10
IC-03The competent authority, its channel and the templates for the initial notification, the intermediate report and the final report are known and readyRC-04, RC-11RN-01, RN-07RD-10, RD-11, RD-12
IC-04Signatories and their deputies are named and have working access to the channel, tested in the last 12 monthsRC-07, RC-08RN-08, RN-17None
IC-05The reporting clocks are in the log and the calendars as soon as a report is madeRC-12RN-10RD-10, RD-11, RD-12
IC-06The notice to clients affected by a major incident is approved in advanceRC-13RN-14RD-13
IC-07Where a third party submits reports for the entity, the contract and its access are in place, and the entity stays responsibleRC-16RN-16None
IC-08Classification and reporting were rehearsed in an exercise in the last 12 months (P10)RC-17RN-17None

P09 owns incident response and every decision right, clock and recovery criterion. P18 holds the classification test and the reporting duties. This workbook states no reporting clock (DR-15). A check is a question to answer when you rate IM-01 and IM-02.

Lists

LevelYesNoEffortAreaNamePriorityNamePriorityDaysEntityNameEntityIdEntityNoMicroFrameworkChoice
Not startedYesSmallScope and proportionalityPriority 130Credit institutioncredit0Full ICT risk management framework (DORA Articles 5 to 15)
PlannedNoMediumICT risk managementPriority 290Payment institution (including an exempted payment institution)payment0Simplified ICT risk management framework (DORA Article 16)
In placeLargeICT-related incident management, classification and reportingPriority 3180Account information service provideraisp0
OperatingDigital operational resilience testingElectronic money institution (including an exempted one)emoney0
Not applicableManagement of ICT third-party riskInvestment firminvestment0
Information sharingCrypto-asset service provider, or issuer of asset-referenced tokenscasp0
SupervisionCentral securities depositorycsd1
Central counterpartyccp1
Trading venuevenue1
Trade repositorytr1
Manager of alternative investment fundsaifm0
Management companymancos0
Data reporting service providerdrsp0
Insurance or reinsurance undertakinginsurer0
Insurance, reinsurance or ancillary insurance intermediaryintermediary0
Institution for occupational retirement provisioniorp0
Credit rating agencycra0
Administrator of critical benchmarksbenchmark0
Crowdfunding service providercrowdfunding0
Securitisation repositorysecuritisation0

Definitions

Definitions

TermMeaning in this workbook
Readiness itemOne of the readiness items, such as IM-01: a group of requirements that the readiness self-assessment rates in words (Not started, Planned, In place or Operating), never as a score.
Level: Not startedNothing exists yet.
Level: PlannedOwner and approach agreed; not yet in place.
Level: In placeDocumented and working, but incomplete, short of its own target, or with too little record for a supervisor to sample.
Level: OperatingWorking in full and meeting its own target, with records a supervisor could sample.
Level: Not applicableThe duty does not apply to the entity. The reason must be recorded, and confirmed with counsel. Left out of the counts at Operating.
Binding dutyAn item with at least one requirement that applies to your profile and is a duty, not an option. Below In place it is a blocking gap.
Blocking gapA readiness item that is binding on this entity type (its requirements apply to the entity and are duties, not options) and is rated below In place. A blocking gap is a duty that is not in place at all.
ResultNot ready: at least one blocking gap, a binding duty rated below In place. Ready, with actions: no blocking gap, but some applicable items are below Operating. Ready: every applicable item is Operating, and each item that does not apply has its reason recorded. The result is one of three words with the counts beside it. It is never a score or a share. Incomplete: an item that applies has no level yet, or the profile is not complete.
Priority 1: Exposed nowA blocking gap: a duty that binds the entity is not in place at all. Due within 30 days of the assessment.
Priority 2: Exposed on requestA binding duty that is in place but not operating: a request for evidence of implementation would find it incomplete. Due within 90 days of the assessment.
Priority 3: ImprovementAny other item below Operating. Due within 180 days of the assessment.
Effort: SmallUnder [[2]] weeks of work, inside one team, within budget.
Effort: Medium[[2]] to [[8]] weeks, or two or more teams, within budget.
Effort: LargeMore than [[8]] weeks, or money the budget does not hold.
ProfileThe result of the scope assessment for one entity: its regime (the full framework, the simplified framework, out of scope, or supplier), whether it is a microenterprise, whether a TLPT authority has identified it, and the requirements that follow.
Management bodyThe body that effectively runs the entity or has key functions under the law that governs it, such as the board (DORA Art 3(30)). It defines, approves and oversees the ICT risk management arrangements and is ultimately responsible for ICT risk (Art 5).
TLPTThreat-led penetration testing: a controlled, intelligence-led red team test of the entity's critical live production systems that copies real threat actors (DORA Art 3(17)). Only entities that a TLPT authority identifies perform it, and then at least every 3 years (Art 26).
DR-01 to DR-23The rules of this pack. DR-03 to DR-06 are quoted on the Instructions sheet.
RQ-xx, RI-xx, S-x, IC-xxA requirement of the Regulation, a readiness item, a step of the readiness sequence, and an incident check.
EXAMPLEA worked example: Lantern Pay Services (EXAMPLE), as at 30 Sep 2026. Clear the EXAMPLE column and the yellow answers before use.

Framework References

Framework references

These references indicate relevance only and do not reproduce the text of any standard.

FrameworkReferenceSupported by
ISO/IEC 27001:2022Clause 9.2 — Internal auditThe workbook as a whole: a planned check of readiness, with its results recorded
NIST CSF 2.0ID.IM-01 — “Improvements are identified from evaluations”Results sheet: the gaps found, in priority order, for improvement
DORA — Regulation (EU) 2022/2554Article 4 — financial entities implement the rules of Chapter II in line with proportionality, taking into account their size and overall risk profile, and the nature, scale and complexity of their services, activities and operations; Chapters III, IV and V, Section I, apply proportionately “as specifically provided for in the relevant rules of those Chapters”; competent authorities consider how the entity applied proportionality when they review its ICT risk management framework on the reports submitted under Articles 6(5) and 16(2)Scope Profile sheet: each requirement applies in proportion to the entity, and the profile says which
DORA — Regulation (EU) 2022/2554Article 5(2) — the management body defines, approves, oversees and is responsible for the ICT risk management framework, bears ultimate responsibility for ICT risk and sets the risk toleranceRM-01: the management body defines, approves and oversees the framework, and is responsible for it
DORA — Regulation (EU) 2022/2554Article 5(4) — members of the management body keep up to date with sufficient knowledge and skills to understand and assess ICT risk, including through regular trainingRM-01: every member of the management body keeps ICT knowledge current, with training on a regular basis
DORA — Regulation (EU) 2022/2554Article 6(5) — the ICT risk management framework is documented and reviewed at least once a year (periodically for microenterprises), upon major ICT-related incidents, and following supervisory instructions or conclusions from digital operational resilience testing or audit processes; “It shall be continuously improved on the basis of lessons derived from implementation and monitoring.” A report on the review is submitted to the competent authority on requestRM-02: the framework is reviewed at least yearly (periodically for a microenterprise), and a report goes to the authority on request
DORA — Regulation (EU) 2022/2554Article 11(6) — test the ICT business continuity plans and the ICT response and recovery plans “in relation to ICT systems supporting all functions at least yearly, as well as in the event of any substantive changes to ICT systems supporting critical or important functions”, and test the crisis communication plans (Article 14); financial entities other than microenterprises include in the testing plans “scenarios of cyber-attacks and switchovers between the primary ICT infrastructure and the redundant capacity, backups and redundant facilities”; the policy and plans are regularly reviewed taking into account test results and recommendations from audit checks or supervisory reviewsRM-06: the continuity, response and recovery plans are tested at least yearly, and deficiencies reach the management body
DORA — Regulation (EU) 2022/2554Article 16(1) — “Articles 5 to 15 of this Regulation shall not apply to” small and non-interconnected investment firms, exempted payment institutions, institutions exempted under Directive 2013/36/EU where the Member State has not applied the Article 2(4) option, exempted electronic money institutions, and small institutions for occupational retirement provision; those entities instead apply the simplified ICT risk management frameworkScope Profile sheet: the Article 16 entities follow a simplified framework, and the items they rate change
DORA — Regulation (EU) 2022/2554Article 17(1) — define, establish and implement an ICT-related incident management process to detect, manage and notify ICT-related incidentsIM-01: an incident management process that detects, manages, records and notifies ICT-related incidents
DORA — Regulation (EU) 2022/2554Article 19(1) — report major ICT-related incidents to the relevant competent authorityIM-02: major incidents reported with an initial notification, an intermediate report and a final report
DORA — Regulation (EU) 2022/2554Article 24(1) — “For the purpose of assessing preparedness for handling ICT-related incidents, of identifying weaknesses, deficiencies and gaps in digital operational resilience, and of promptly implementing corrective measures”, financial entities other than microenterprises establish, maintain and review a digital operational resilience testing programmeRT-01: a digital operational resilience testing programme as part of the framework
DORA — Regulation (EU) 2022/2554Article 24(6) — at least yearly, appropriate tests on all ICT systems and applications supporting critical or important functionsRT-02: every ICT system and application behind a critical or important function is tested at least yearly
DORA — Regulation (EU) 2022/2554Article 28(3) — a register of information on all contractual arrangements for ICT services, distinguishing those supporting critical or important functionsTP-01: the register of information on all contractual arrangements for ICT services
DORA — Regulation (EU) 2022/2554Article 28(8) — for ICT services supporting critical or important functions, financial entities put in place exit strategies that take account of provider failure, deteriorating quality, business disruption and termination; they must be able to exit without disruption to business activities, without limiting regulatory compliance and without detriment to the continuity and quality of services to clients; exit plans are comprehensive, documented and “sufficiently tested and reviewed periodically”, with alternative solutions, transition plans and contingency measuresTP-05: an exit plan for each arrangement that supports a critical or important function, tested and reviewed periodically
DORA — Regulation (EU) 2022/2554Article 30(3) — additional contract content for critical or important functions: full service levels, notice duties, contingency plans and security, testing participation, audit and access rights, exit strategiesTP-04: the additional contract terms for services that support critical or important functions
DORA — Delegated Regulation (EU) 2024/1774Article 1 — the ICT security policies, procedures, protocols and tools of Title II, and the simplified framework of Title III, take into account the entity’s size and overall risk profile and the nature, scale and elements of increased or reduced complexity of its services, activities and operations, including encryption and cryptography, ICT operations security, network security, ICT project and change management, and the potential impact of ICT risk on the confidentiality, integrity and availability of data and on the continuity of activitiesScope Profile sheet and items RM-02 to RM-05: Delegated Regulation 2024/1774 applies the framework in proportion to the entity
DORA — Delegated Regulation (EU) 2024/1774Article 40(1) — the entities under the simplified framework test their business continuity plans, including the scenarios referred to in Article 39, “at least once every year for the back-up and restore procedures, or upon every major change of the business continuity plan”RM-06 for Article 16 entities: backup and restore procedures tested at least yearly, or on a major change to the plan

Editions referenced: ISO/IEC 27001:2022 incl. Amd 1:2024; NIST CSF 2.0; Regulation (EU) 2022/2554 (DORA); Delegated Regulations (EU) 2024/1772, 2024/1773, 2024/1774, 2025/301, 2025/532 and 2025/1190; Implementing Regulations (EU) 2024/2956 and 2025/302; as published in the Official Journal and read on 8 October 2026

ISO/IEC 27001 references name the clause or control this document relates to, by number and title only. They do not say that meeting one meets any DORA requirement.

These references show where this document supports an external framework. They indicate relevance only and do not reproduce the text of any standard.

Regulation (EU) 2022/2554 binds the financial entities of its Article 2(1), points (a) to (t), except those Article 2(3) excludes and any that a Member State excludes under Article 2(4). Articles 5 to 15 do not apply to the entities of its Article 16(1), which follow Article 16 and Title III of Delegated Regulation (EU) 2024/1774. Several duties do not apply to microenterprises, and the Regulation says where. It reaches an ICT third-party service provider through the contract with a financial entity and, for a provider designated as critical, through the oversight framework of Chapter V, Section II.

The Delegated and Implementing Regulations bind the same financial entities as the Regulation they supplement, for the articles each applies to. Title II of Delegated Regulation (EU) 2024/1774 is for the entities that follow Articles 5 to 15; its Title III is for the entities of DORA Article 16(1). Delegated Regulation (EU) 2025/1190 binds only the entities that a TLPT authority identifies.

The competent authority for each financial entity is the one DORA Article 46 names for its type. National law and the authority's own instructions set the dates and channels for the register of information and for reports. None of them is stated here.

Prepared by Zero One Cybersecurity · Published by CISO Times

CISO Times Resource Licence — Internal Use