Independent thinking. Informed defence.

CISO Times

Intelligence for the people behind the defence.

The CISO Decision Brief

Digital Operational Resilience Testing Programme

Plans the risk-based testing programme across vulnerability assessments, scenario tests and, where applicable, TLPT.

Available soon

Format
Excel
Size
90 KB
Length
12 sheets
Version
1.1
Updated

What's inside

What changed

  1. 1.1

    The mappings note no longer says the CISO Times Library shows a verification state; it says what a mapping shows and to confirm it against both texts.

  2. 1.0

    Published.

Changes across this pack

Preview

The workbook's sheets as you will receive them, with its example rows and the values its formulas calculate. Highlighted [[text]] is for you to replace; rows marked EXAMPLE are for you to delete. Wide sheets scroll sideways. The cover, document control and changelog sheets are in the file.

Instructions

How to use this workbook

StepWhat to do
1What this workbook is. It is the testing programme DORA Article 24 asks the entity to keep (A resilience testing programme, RQ-32) and the yearly test list of Article 24(6) (RQ-33). The resilience testing lead keeps it. It does not decide whether DORA binds you: take your answers from the DORA Proportionality & Scope Assessment.
2Start on the Profile and counts sheet. Set the as-at date and the programme start. Choose the entity type, the framework (full, simplified or out of scope), whether you are a microenterprise, and whether a TLPT authority has identified you. A TLPT authority cannot identify an Article 16 entity or a microenterprise; the sheet says so if you try (DR-01, DR-16).
3Read the frequency rules TR-1 to TR-6 on the same sheet. Each shows whether it applies to you. A microenterprise tests on its own risk-based plan (TR-5, RQ-35): the dates here are still a good discipline, but your plan sets the frequency.
4Check the test types, DT-01 to DT-16. Set the months between tests for the types shaded yellow, which are house defaults. Where a type has no test planned, write why (RQ-34: say why each type was chosen or left out).
5List the systems on the Systems sheet. Mark each Yes if it supports a critical or important function. Mark a system Yes until its function has been assessed (DR-10). Enter the date it went into service: that starts the clock for a system that has never been tested.
6Record every test of a system on the Test log sheet: system, test type, date, whether it was held, whether an independent party did it, the tester and the result. Enter a test that did not count too, with its reason. Only a held test by an independent party, dated on or before the as-at date, counts (DR-12, DORA Art 24(4)).
7An exercise or tabletop under P10 is an exercise. It is not a test of a system and is never counted as one. P22 RR-14 owns the recovery test and P23 BR-13 owns the restore test. P21 counts a P22 or P23 test as a continuity test (DT-14) when its record meets their rules, and restates neither.
8Plan the recurring tests on the Programme sheet: one row per test, its type, its scope, the date of the last test that counts and who keeps it. The sheet works out the next due date and the state. A test of the continuity, response and recovery plans (DT-14) quotes the P22 or P23 record it comes from.
9Read the states. Current: not yet due. Overdue: due before the as-at date. Never tested: a system with no test that counts and a first test that fell due. An overdue system or test is a gap: enter it in the DORA Gap & Remediation Tracker with an owner, a priority and a due date (DR-06).
10Enter every test finding in the DORA Gap & Remediation Tracker, with an owner, a priority and a due date. A person other than the one who fixed a weakness confirms that it is fully addressed (DR-14, DORA Art 24(5)). Write the tracker IDs in the Test log's findings column.
11Use the TLPT sheet only if a TLPT authority has identified the entity (DR-16). It checks your plan against Delegated Regulation (EU) 2025/1190, works out the deadlines from the dates you enter, and lists the file to keep.
12Read the counts on the Profile and counts sheet, such as "4 of 5 systems tested in time". The DORA Readiness Self-Assessment uses them for readiness items RT-02 and RM-06. Report counts with names to the management body. Never report a percentage (DR-04).
13Review the programme at least every [[12]] months, and after a substantive change to the systems behind a critical or important function (DORA Art 11(6)). Keep the records behind each test for the period in DR-19. The DORA Documentation & Evidence Checklist lists them (EV-21 to EV-24).
14To clear the EXAMPLE, delete the EXAMPLE rows on the Programme, Systems and Test log sheets once your own are entered, and replace the settings on the Profile and counts sheet. The formulas stay.

Legend

Yellow cells are inputs. Everything else is calculated or fixed — do not overwrite formulas.

EXAMPLERows marked EXAMPLE in the first column show how a completed row looks. Delete them before approval.

Limitations: This document helps you see what DORA asks of an entity like yours and what you can show. It is not legal advice, and following it is not a statement that you comply with DORA or any standard. Whether DORA binds you, and which of its duties apply to you, depends on what you are, how you are authorised and how your Member State and your supervisor apply it: confirm it with counsel or your competent authority.

Who this is for: DORA is one regulation with five pillars: ICT risk management, ICT-related incident management and reporting, digital operational resilience testing, the management of ICT third-party risk, and information sharing. Every financial entity meets the same five pillars, and the depth of each depends on what the entity is. A microenterprise, a small investment firm, an exempted payment institution and a large bank each owe a different part of each pillar, and the Regulation says which. So the first question is what you are, the second is which duties that makes yours, and only then is it worth asking how ready you are. Being ready is a count of duties in place and duties still open. It is never one score.

P09 owns incident response and every decision right, clock and recovery criterion (DR-15). P22 RR-14 owns the recovery test and P23 BR-13 owns the restore test. This workbook cites them by ID and counts a P22 or P23 test as a continuity test (DT-14) only when its own record meets their rules (DR-13).

EXAMPLE: Lantern Pay Services (EXAMPLE), a small authorised payment institution in an EU Member State, with 64 staff, as at 30 Sep 2026. Its profile is the full framework; it is not a microenterprise and no TLPT authority has identified it. 4 of 5 systems behind its critical function have a test that counts in the last 12 months; SYS-02 fell due on 29 Aug 2026. The programme was approved on 2026-01-28, uses independent testers and has a finding register with validated closure.

What counts as a test:

• A test counts towards the yearly test of a system behind a critical or important function when it was held, was done by an independent party and is dated on or before the as-at date.

• Independent means a party apart from the people who built or operate the system, internal or external (DORA Art 24(4)). An internal tester needs enough resources and no conflict of interest.

• A planned test, a cancelled test and a test run by the system's own team do not count. Enter them with Held or Independent set to No to keep the record.

Adapting this template:

• Replace the [[placeholders]] with your own values, and delete the EXAMPLE rows on the Programme, Systems and Test log sheets once you have entered your own. The formulas stay.

• Change the months between tests for the house defaults on the Profile and counts sheet only if your testing programme sets different ones. Never set an interval longer than the one your approved programme sets. The two intervals that DORA sets (DT-14, DT-15) and the TLPT interval (DT-13) are not shaded: change them only if your competent authority tells you to, and say so in the document control table.

• Use your own system IDs if your asset inventory or your register of information already has them. Keep one ID for each system for its whole life, so the test log stays linked to it.

• Add your own columns to the right of the calculated ones, so the layout stays the same as the formulas expect.

• If your approved testing programme is a document, keep it with this workbook. This workbook holds the dates, the tests and the states. The document holds the reasoning (DORA Art 24(3): the risk-based approach).

This workbook is your own record. Keep it with your approved testing programme and the test reports behind each row.

Profile and counts

Profile, rules, counts and test types

Enter the entity's answers (yellow). The white cells apply the facts to them: which frequency rules apply, the TLPT status, the counts and, for each test type, how many tests are planned or recorded. Counts only: no score and no percentage (DR-04).

Profile and settings

As-at date30 Sep 2026States are worked out at this date. EXAMPLE: 30 Sep 2026. Type a date, never a formula.
Programme start1 Jan 2026The clock for a test that has never been run starts here. The EXAMPLE uses 1 Jan 2026. Use the date your programme was approved, or the date DORA applied to you.
Entity type (DORA Art 2(1))Payment institution (including an exempted payment institution)From the DORA Proportionality & Scope Assessment. Used for the TLPT status below.
FrameworkFull ICT risk management framework (DORA Articles 5 to 15)From the scope assessment. An entity outside DORA, or a supplier to a financial entity, has no duty from this workbook (DR-22).
Microenterprise (DORA Art 3(60))NoFewer than 10 persons and turnover or balance sheet total of EUR 2 million or less, and not a trading venue, central counterparty, trade repository or central securities depository.
A TLPT authority has identified the entityNoAnswer Yes only if the authority has told you in writing (DORA Art 26(8)). Being regulated does not make it Yes (PF-08).
Framework key (calc)fullFull, simplified, or other (outside DORA, or a supplier).
TLPT applies to you (calc)NoYes only for an entity under the full framework, not a microenterprise, that a TLPT authority has identified (DORA Art 26(1)).
TLPT status (calc)Not required unless a TLPT authority identifies the entity (Article 26(8)). Delegated Regulation 2025/1190 Article 2(2) names payment institutions that exceeded EUR 150 billion of total value of payment transactions in each of the 2 calendar years before the assessment; the authority may decide that the assessment does not justify TLPT.
Check on the identification (calc)No conflict

The frequency rules DORA sets (TR-1 to TR-6)

RuleWho it bindsWhat it asksApplies to you (calc)MonthsSource
TR-1Every financial entity in scope other than microenterprisesAt least yearly, appropriate tests on all ICT systems and applications that support critical or important functions, by independent parties (every 12 months).Yes12DORA 24(6)
TR-2Entities under the full framework (not the Article 16 entities)Test the continuity plans and the response and recovery plans for the systems that support all functions at least yearly (every 12 months), and after a substantive change to the systems behind critical or important functions; test the crisis communication plans.Yes12DORA 11(6)
TR-3Entities under the simplified framework (Article 16)Entities under the simplified framework test the business continuity plans at least once every year for the backup and restore procedures, or on every major change to the plan (every 12 months).No12RTS 40(1)
TR-4Entities that a TLPT authority has identifiedAn entity that a TLPT authority has identified performs TLPT at least every 3 years; the authority may raise or lower the frequency.No36DORA 26(1)
TR-5MicroenterprisesMicroenterprises test on a risk basis with a strategic plan for testing, and set their own frequency.NoYour planDORA 25(3)
TR-6Every financial entity in scopeExit plans for arrangements that support critical or important functions are tested and reviewed periodically. The period is the entity's: the default here is a house default.Yes12DORA 28(8)

Counts

Systems behind a critical or important function5DORA Art 24(6), RQ-33.
of them with a test that counts inside the last 12 months4The state is Current.
In words4 of 5 systems tested in timeReport this to the management body. Never a percentage (DR-04).
Overdue or never testedSYS-02System IDs, in the order of the Systems sheet. Each is a gap for the tracker (DR-06).
Suggested level for readiness item RT-02 (DORA Readiness Self-Assessment)In placeOperating only if every system is Current. The self-assessment sets the level; this is the evidence.
Recurring tests in the programme that apply to you7Programme sheet, rows where the test applies.
of them with an interval7Compatibility testing (DT-09) has none: it is "Run on change".
of those overdue1The next due date is before the as-at date.
In words1 of 7 dated tests overdue
Tests that run when something changes0
Suggested level for readiness item RM-06 (DORA Readiness Self-Assessment)In placeFrom the DT-14 row: the yearly test of the continuity, response and recovery plans (DORA Art 11(6)).
Test types that apply to you15DT-13 (TLPT) applies only when a TLPT authority has identified you.
Test types with a test planned or recorded10 of 15 test typesRQ-34: say why each type was chosen or left out. The reasons are below.

Test types (DT-01 to DT-16)

TestTest typeWhat it isSourceMonths between testsWhere the interval comes fromPlanned or recorded tests (calc)Applies to you (calc)Reason if no test is planned (RQ-34)
DT-01Vulnerability assessments and scansFinds known weaknesses in systems, applications and networks.Article 25(1)3House default2Yes
DT-02Open source analysesChecks the open source components the entity's software uses for known weaknesses and licence risks.Article 25(1)12House default0Yes[[Why this type is not in the programme, or when it will be]]
DT-03Network security assessmentsReviews network design, segmentation and configuration against the entity's own rules.Article 25(1)12House default0Yes[[Why this type is not in the programme, or when it will be]]
DT-04Gap analysesCompares what exists with what the policy or the rule asks for.Article 25(1)12House default1Yes
DT-05Physical security reviewsChecks the premises, data centres and sensitive areas that hold ICT assets.Article 25(1)12House default1Yes
DT-06Questionnaires and scanning software solutionsCollects answers or automated scan results from system owners or providers.Article 25(1)12House default1Yes
DT-07Source code reviews (where feasible)Reads the code of the entity's own applications for security flaws.Article 25(1)12House default1Yes
DT-08Scenario-based testsRuns a defined disruption or attack scenario against a system or process.Article 25(1)12House default0Yes[[Why this type is not in the programme, or when it will be]]
DT-09Compatibility testingChecks that a change works with the systems around it.Article 25(1)No fixed interval0Yes[[Why this type is not in the programme, or when it will be]]
DT-10Performance testingChecks capacity and behaviour under load (DORA Art 7).Article 25(1)12House default0Yes[[Why this type is not in the programme, or when it will be]]
DT-11End-to-end testingFollows a business transaction through every system that handles it.Article 25(1)12House default1Yes
DT-12Penetration testingAn authorised attempt to break into a system, run by someone independent of its builders and operators.Article 25(1)12House default2Yes
DT-13Threat-led penetration testing (TLPT)A red team test of critical live production systems that copies real threat actors. Only for entities a TLPT authority identifies.Article 2636Set by DORA0No: needs a TLPT authority's identification
DT-14Test of the continuity, response and recovery plansTests the plans for the systems that support all functions, and again after a substantive change to the systems behind critical or important functions. Recovery tests are P22 RR-14; restore tests are P23 BR-13.Article 11(6)12Set by DORA1Yes
DT-15Test of the crisis communication plansTests the plans of Article 14.Article 11(6)(b)12Set by DORA1Yes
DT-16Test and review of an exit planTests and reviews the exit plan of an arrangement that supports a critical or important function. DORA says 'periodically'.Article 28(8)12House default1Yes

EXAMPLE: DT-01 to DT-12 are the twelve kinds of test DORA Article 25(1) lists, in its order. DT-13 to DT-16 are the tests Articles 26, 11(6) and 28(8) add. DORA fixes the interval only for DT-13, DT-14 and DT-15 (and the yearly test of Article 24(6) for each system); the other intervals are house defaults you set.

Entities that Delegated Regulation 2025/1190 Article 2(2) names for TLPT

Entity typeNamed by the Delegated Regulation
Credit institutionglobal or other systemically important credit institutions, and credit institutions that are part of one
Payment institution (including an exempted payment institution)payment institutions that exceeded EUR 150 billion of total value of payment transactions in each of the 2 calendar years before the assessment
Electronic money institution (including an exempted one)electronic money institutions that exceeded EUR 150 billion of payment transactions, or EUR 40 billion of outstanding electronic money, in each of the 2 calendar years before the assessment
Central securities depositorycentral securities depositories
Central counterpartycentral counterparties
Trading venuetrading venues above the market-share criteria of Article 2(2)(f)
Insurance or reinsurance undertakinginsurance and reinsurance undertakings above the premium, provisions and asset criteria of Article 2(2)(g)

The authority may decide that its assessment does not justify TLPT for an entity on this list (DORA Art 26(8)).

Programme

EXAMPLE: 7 recurring tests, as at 30 Sep 2026. Yellow columns are inputs; white columns calculate from the Profile and counts sheet. One row per recurring test. Systems have their own rows on the Systems sheet.

ExamplePlan IDTest typeTest type name (calc)ScopeSource (calc)Months between tests (calc)Where the interval comes from (calc)Latest test that countsApplies to you (calc)Next test due (calc)State (calc)OwnerIndependent tester or providerRelated test record (report, P22 RR-14, P23 BR-13)
EXAMPLET-01DT-01Vulnerability assessments and scansAll internet-facing and payment systems, quarterlyArticle 25(1)3House default18 Sep 2026Yes18 Dec 2026CurrentSecurity Assurance Lead
EXAMPLET-02DT-04Gap analysesGap analysis against the frameworkArticle 25(1)12House default10 Feb 2026Yes10 Feb 2027CurrentSecurity Assurance Lead
EXAMPLET-03DT-05Physical security reviewsOffice and the two hosting suitesArticle 25(1)12House default20 Jan 2026Yes20 Jan 2027CurrentSecurity Assurance Lead
EXAMPLET-04DT-06Questionnaires and scanning software solutionsSupplier questionnaires for the seven arrangementsArticle 25(1)12House default30 Jun 2026Yes30 Jun 2027CurrentSecurity Assurance Lead
EXAMPLET-05DT-14Test of the continuity, response and recovery plansContinuity, response and recovery plans for all functions (P22 RR-14, P23 BR-13 for the recovery and restore tests)Article 11(6)12Set by DORA26 Aug 2025Yes26 Aug 2026OverdueHead of Information Security
EXAMPLET-06DT-15Test of the crisis communication plansCrisis communication planArticle 11(6)(b)12Set by DORA24 Feb 2026Yes24 Feb 2027CurrentHead of Information Security
EXAMPLET-07DT-16Test and review of an exit planExit plan for CA-001Article 28(8)12House defaultYes1 Jan 2027CurrentHead of Procurement

Systems

EXAMPLE: 6 systems, 5 of them behind a critical or important function, as at 30 Sep 2026. Yellow columns are inputs; white columns calculate from the Test log sheet. One row per system (DORA Art 24(6), DR-12).

ExampleSystem IDSystem or applicationSupports a critical or important functionIn service sinceLatest test that counts (calc)Test type (calc)Tester (calc)Result (calc)Next test due (calc)State (calc)Order if overdue (calc)
EXAMPLESYS-01Payment processing platform (run by Platform Provider A, CA-001)Yes1 May 202224 Mar 2026DT-11Internal quality assurance, apart from the platform teamNo findings24 Mar 2027Current
EXAMPLESYS-02Settlement API gatewayYes1 Jun 202129 Aug 2025DT-12External testerTwo medium findings, closed29 Aug 2026Overdue1
EXAMPLESYS-03Payments ledger databaseYes1 Jun 20212 Sep 2026DT-01Security team, apart from the database administratorsOne low finding2 Sep 2027Current
EXAMPLESYS-04Fraud rules engineYes1 Mar 202312 May 2026DT-07External testerOne medium finding, closed12 May 2027Current
EXAMPLESYS-05Customer authentication serviceYes1 May 202221 Apr 2026DT-12External testerNo findings21 Apr 2027Current
EXAMPLESYS-06Back-office reporting server (legacy)No1 Mar 2016Not behind a critical or important function

Test log

EXAMPLE: 5 tests of the 6 systems. One row per test. A P10 exercise or tabletop is not a test of a system and is never entered here (DR-13). P22 RR-14 recovery tests and P23 BR-13 restore tests are plan-level tests: enter them on the Programme sheet as DT-14, with their record.

ExampleSystem IDTest typeTest dateHeldBy an independent partyTesterResultReport or record referenceFindings in the tracker (A09 IDs)Counts towards Art 24(6) (calc)Lookup key (calc)
EXAMPLESYS-01DT-1124 Mar 2026YesYesInternal quality assurance, apart from the platform teamNo findingsYesSYS-01|46105
EXAMPLESYS-02DT-1229 Aug 2025YesYesExternal testerTwo medium findings, closedYesSYS-02|45898
EXAMPLESYS-03DT-012 Sep 2026YesYesSecurity team, apart from the database administratorsOne low findingYesSYS-03|46267
EXAMPLESYS-04DT-0712 May 2026YesYesExternal testerOne medium finding, closedYesSYS-04|46154
EXAMPLESYS-05DT-1221 Apr 2026YesYesExternal testerNo findingsYesSYS-05|46133

TLPT

Threat-led penetration testing (TLPT): only if identified

An entity that the competent authority identifies carries out TLPT at least every 3 years, which may be raised or lowered. Each test covers several or all critical or important functions on live production systems, with the scope validated by the authority. The entity ensures that its ICT third-party providers in scope take part and stays responsible. It uses testers that meet Article 27 and contracts external testers every three tests. TLPT is planned only after a TLPT authority has identified the entity. An Article 16 entity or a microenterprise never plans one. When identified, the entity follows Delegated Regulation 2025/1190 and Article 27 for its testers.

Your status

TLPT applies to youNoFrom the Profile and counts sheet.
Not required unless a TLPT authority identifies the entity (Article 26(8)). Delegated Regulation 2025/1190 Article 2(2) names payment institutions that exceeded EUR 150 billion of total value of payment transactions in each of the 2 calendar years before the assessment; the authority may decide that the assessment does not justify TLPT.

Planning checks (Delegated Regulation 2025/1190)

CheckYour planThe ruleResultSource
Active red team testing phase, in weeksAt least 12 weeks, and proportionate to the scope and scaleEnter your planRTS 1190 11
Scenarios the control team lead selectsAt least 3Enter your planRTS 1190 10
of them not threat-ledNo more than 1Enter your planRTS 1190 10

Dates and deadlines (Delegated Regulation 2025/1190)

EventDateDeadlineDeadline date (calc)Source
The authority notifies you that you must perform TLPTInitiation information to the test managers, within 3 monthsRTS 1190 9
The active red team testing phase endsRed team test report from the testers, within 4 weeksRTS 1190 12
(same date)Blue team report, replay and purple teaming, no later than 10 weeks after itRTS 1190 12
The authority notifies you that the reports are adequateSummary report of findings to the TLPT authority, within 8 weeksRTS 1190 12
(same date)Remediation plans and documentation under DORA Art 26(6), within 8 weeksRTS 1190 13
The deadlines count from the dates you enter. The authority's own notices and the test managers set the dates in practice: check each against them. Enter the date of the last TLPT on the DT-13 row of the Programme sheet; the next one falls due 3 years later unless the authority changes the frequency (DORA Art 26(1)).

The TLPT file: what to have ready

RecordStatusSourceRequirement
The authority's identification letter and the validated scopeArticle 26(1) to (3), (8)RQ-37
The TLPT plan, the test managers' approvals and the provider participation termsArticle 26(1) to (3), (8)RQ-37
The summary report, the remediation plans and the attestationArticle 26(6), (7); Delegated Regulation 2025/1190 Articles 12 and 13RQ-38
Tracking of each finding to closureArticle 26(6), (7); Delegated Regulation 2025/1190 Articles 12 and 13RQ-38
The tester selection record against each criterionArticle 27RQ-39
The contract terms for handling the resultsArticle 27RQ-39

0 of 6 records ready

Lists

YesNoEntityTypeRegimeListEvidenceStatus
YesCredit institutionFull ICT risk management framework (DORA Articles 5 to 15)Ready
NoPayment institution (including an exempted payment institution)Simplified ICT risk management framework (DORA Article 16)Partly ready
Account information service providerOut of scope of DORANot ready
Electronic money institution (including an exempted one)Not applicable

Investment firm

Crypto-asset service provider, or issuer of asset-referenced tokens

Central securities depository

Central counterparty

Trading venue

Trade repository

Manager of alternative investment funds

Management company

Data reporting service provider

Insurance or reinsurance undertaking

Insurance, reinsurance or ancillary insurance intermediary

Institution for occupational retirement provision

Credit rating agency

Administrator of critical benchmarks

Crowdfunding service provider

Securitisation repository

Definitions

Definitions

TermMeaning in this workbook
Test (DT-nn)One of the test types DT-01 to DT-16. DT-01 to DT-12 are the kinds of test in DORA Article 25(1). DT-13 is TLPT. DT-14 to DT-16 are the tests of the plans, the crisis communication plans and an exit plan.
Test that countsA test of a system that was held, was done by an independent party and is dated on or before the as-at date (DR-12). Only these start the yearly clock of Article 24(6).
Independent partyA party apart from the people who built or operate the system, internal or external (DORA Art 24(4)).
Behind a critical or important functionA system or application that supports a critical or important function. Function: critical or important function (DORA Art 3(22)). Treat a system as behind one until its function is assessed (DR-10).
Critical or important functionA function whose disruption would materially impair the entity's financial performance, or the soundness or continuity of its services and activities, or its continuing compliance with the conditions of its authorisation (DORA Art 3(22)). The entity decides, records why, and reviews the decision (DR-09).
TLPTThreat-led penetration testing: a controlled, intelligence-led red team test of the entity's critical live production systems that copies real threat actors (DORA Art 3(17)). Only entities that a TLPT authority identifies perform it, and then at least every 3 years (Art 26).
MicroenterpriseA financial entity, other than a trading venue, a central counterparty, a trade repository or a central securities depository, with fewer than 10 persons and an annual turnover or balance sheet total of EUR 2 million or less (DORA Art 3(60)).
Simplified frameworkThe lighter framework of DORA Article 16 for small and non-interconnected investment firms, exempted payment and electronic money institutions, and similar entities. Articles 5 to 15 do not apply to them.
Programme startThe date the clock starts for a test that has never been run. A setting of this workbook, not a date set by DORA.
House defaultAn interval this workbook proposes where DORA says only that tests happen. You set your own in the test types table (DT-16 and the others shaded yellow).
Exercise (P10)A tabletop or other exercise run under P10. It is never a test of a system and is never counted (DR-13).
Recovery test, restore testThe recovery test is P22 RR-14 and the restore test is P23 BR-13. This workbook counts a P22 or P23 test as a continuity test (DT-14) when its record meets their rules (DR-13).
Gap, findingA gap is a duty below the level it should be at; a finding is a weakness a test found. Both go in the gap tracker with an owner, a priority and a due date (DR-06, DR-14).
CurrentThe latest test that counts is inside its interval: the next test is not yet due.
OverdueThe next test was due before the as-at date. A system with an old test, or a programme row with an old last test.
Never testedA system behind a critical or important function has no test that counts, and its first yearly test fell due before the as-at date. The clock runs from the date the system went into service.
Run on changeA test type with no fixed interval (compatibility testing, DT-09). Run it when a change needs it.
Not requiredA test the profile does not require. TLPT (DT-13) is required only when a TLPT authority has identified the entity.
Not behind a critical or important functionThe system supports no critical or important function, so the yearly test of DORA Article 24(6) does not apply to it. Test it on your risk-based plan.
(calc)A column or cell the workbook calculates. Do not type or paste over it.
EXAMPLEA worked example: Lantern Pay Services (EXAMPLE), a small fictional payment institution, as at 30 Sep 2026. Delete before use.

Framework References

Framework references

These references indicate relevance only and do not reproduce the text of any standard.

FrameworkReferenceSupported by
ISO/IEC 27001:2022Annex A 5.30 — ICT readiness for business continuityProgramme sheet, DT-14: the tests of the continuity, response and recovery plans, and the dates they fall due
ISO/IEC 27001:2022Annex A 8.8 — Management of technical vulnerabilitiesProgramme and Systems sheets: vulnerability assessments and scans (DT-01) and the other tests that find technical weaknesses, and when each falls due
NIST CSF 2.0ID.IM-02 — “Improvements are identified from security tests and exercises, including those done in coordination with suppliers and relevant third parties”Test log sheet: each test and its result, with the findings entered in the gap tracker so improvements follow from them
DORA — Regulation (EU) 2022/2554Article 4 — financial entities implement the rules of Chapter II in line with proportionality, taking into account their size and overall risk profile, and the nature, scale and complexity of their services, activities and operations; Chapters III, IV and V, Section I, apply proportionately “as specifically provided for in the relevant rules of those Chapters”; competent authorities consider how the entity applied proportionality when they review its ICT risk management framework on the reports submitted under Articles 6(5) and 16(2)Profile and counts sheet: the framework and microenterprise answers set which rules apply, so depth follows size and risk. A microenterprise tests on its own risk-based plan
DORA — Regulation (EU) 2022/2554Article 11(6) — test the ICT business continuity plans and the ICT response and recovery plans “in relation to ICT systems supporting all functions at least yearly, as well as in the event of any substantive changes to ICT systems supporting critical or important functions”, and test the crisis communication plans (Article 14); financial entities other than microenterprises include in the testing plans “scenarios of cyber-attacks and switchovers between the primary ICT infrastructure and the redundant capacity, backups and redundant facilities”; the policy and plans are regularly reviewed taking into account test results and recommendations from audit checks or supervisory reviewsProgramme sheet, DT-14 and DT-15: the yearly test of the continuity, response and recovery plans and of the crisis communication plans. Recovery tests are P22 RR-14 and restore tests are P23 BR-13, entered by ID
DORA — Regulation (EU) 2022/2554Article 24(1) — “For the purpose of assessing preparedness for handling ICT-related incidents, of identifying weaknesses, deficiencies and gaps in digital operational resilience, and of promptly implementing corrective measures”, financial entities other than microenterprises establish, maintain and review a digital operational resilience testing programmeProgramme and Systems sheets: the programme, its schedule and when each test falls due, to be kept as part of the ICT risk management framework
DORA — Regulation (EU) 2022/2554Article 24(3) — financial entities other than microenterprises follow a risk-based approach in the testing programme, considering the evolving landscape of ICT risk, specific risks to which the entity is or might be exposed, the criticality of information assets and of services provided, and any other factor the entity deems appropriateTest types table on the Profile and counts sheet: the reason each test type is chosen or left out, so the programme follows risk
DORA — Regulation (EU) 2022/2554Article 24(4) — financial entities other than microenterprises ensure that tests are undertaken by independent parties, internal or external; where an internal tester is used, sufficient resources are dedicated and conflicts of interest are avoided throughout the design and execution of the testTest log sheet: the independent-party column. Only a held test by an independent party counts
DORA — Regulation (EU) 2022/2554Article 24(5) — procedures and policies to prioritise, classify and remedy all issues revealed by the tests, and internal validation methodologies to ascertain that all identified weaknesses, deficiencies or gaps are fully addressedTest log sheet: the findings column points to the gap tracker (DORA Gap & Remediation Tracker), where each finding has a priority, an owner, a due date and a validated closure
DORA — Regulation (EU) 2022/2554Article 24(6) — at least yearly, appropriate tests on all ICT systems and applications supporting critical or important functionsSystems sheet: each system behind a critical or important function, its latest test that counts, the next due date and its state; the count on the Profile and counts sheet
DORA — Regulation (EU) 2022/2554Article 25(1) — the testing programme provides for appropriate tests, among them “scenario-based tests”Test types table on the Profile and counts sheet: the twelve kinds of test DT-01 to DT-12, and the count of tests planned or recorded for each
DORA — Regulation (EU) 2022/2554Article 25(2) — central securities depositories and central counterparties perform vulnerability assessments before any deployment or redeployment of new or existing applications and infrastructure components, and of ICT services supporting critical or important functionsTest types table: DT-01, vulnerability assessments. A central securities depository or central counterparty also assesses before any deployment or redeployment: record those in the Test log sheet
DORA — Regulation (EU) 2022/2554Article 25(3) — microenterprises perform the Article 25(1) tests by combining a risk-based approach with a strategic planning of ICT testing, balancing the resources and time allocated to testing against the urgency, type of risk, criticality of information assets and of services provided, and any other relevant factor, including the entity’s ability to take calculated risksProfile and counts sheet: the microenterprise answer and rule TR-5, so a microenterprise sets its own frequency from a risk-based plan
DORA — Regulation (EU) 2022/2554Article 26(1) — financial entities, other than the entities of Article 16(1) first subparagraph and other than microenterprises, that the competent authority identifies under Article 26(8) carry out advanced testing by TLPT “at least every 3 years”; the authority may, on the entity’s risk profile and operational circumstances, ask it to reduce or increase that frequencyProfile and counts sheet (TLPT status), the DT-13 row of the Programme sheet and the TLPT sheet: TLPT applies only when a TLPT authority has identified the entity, at least every 3 years unless the authority changes it
DORA — Regulation (EU) 2022/2554Article 26(2) — each TLPT covers several or all critical or important functions and is performed on live production systems supporting them; the entity identifies all relevant underlying ICT systems, processes and technologies, including those outsourced to ICT third-party service providers, and assesses which critical or important functions the TLPT must cover; that assessment sets the precise scope and is validated by the competent authoritiesTLPT sheet, the file: the scope validated by the authority and the plan
DORA — Regulation (EU) 2022/2554Article 26(3) — where ICT third-party service providers are in the scope of a TLPT, the financial entity takes the necessary measures and safeguards to ensure their participation and “shall retain at all times full responsibility for ensuring compliance with this Regulation”; Article 26(4) allows pooled testing, directed by one designated financial entity, in defined circumstancesTLPT sheet, the file: the terms that bring the ICT third-party service providers in scope into the test
DORA — Regulation (EU) 2022/2554Article 26(6) and (7) — at the end of the test, once reports and remediation plans are agreed, the entity and any external testers give the TLPT authority a summary of the relevant findings, the remediation plans and the documentation showing the test followed the requirements; the authority then provides an attestation, which allows mutual recognition between authoritiesTLPT sheet, the file: the summary report, the remediation plans and the attestation; and the deadlines for them
DORA — Regulation (EU) 2022/2554Article 26(8) — financial entities contract testers under Article 27; where they use internal testers they contract external testers every three tests; competent authorities identify the entities required to perform TLPT on impact-related factors, possible financial stability concerns and the specific ICT risk profile, level of ICT maturity or technology features involvedProfile and counts sheet: the TLPT identification answer and the entities the Delegated Regulation names; TLPT sheet: the testers contracted
DORA — Regulation (EU) 2022/2554Article 27(1) — testers for TLPT are of the highest suitability and reputability; have technical and organisational capabilities and specific expertise in threat intelligence, penetration testing and red team testing; are certified by an accreditation body in a Member State or adhere to formal codes of conduct or ethical frameworks; provide independent assurance or an audit report on the sound management of the risks of carrying out TLPT; and are covered by professional indemnity insurance, including against misconduct and negligenceTLPT sheet, the file: the tester selection record against each criterion
DORA — Regulation (EU) 2022/2554Article 27(2) — internal testers must in addition be approved by the competent authority or the single public authority designated under Article 26(9) and (10), which has verified that the entity has sufficient dedicated resources and has avoided conflicts of interest; the threat intelligence provider is external to the entityTLPT sheet, the file: the contract terms for the testers, internal or external, and the external threat intelligence provider
DORA — Regulation (EU) 2022/2554Article 30(3)(d) — contracts for ICT services supporting critical or important functions include “the obligation of the ICT third-party service provider to participate and fully cooperate in the financial entity’s TLPT as referred to in Articles 26 and 27”TLPT sheet, the file: the provider's duty to take part in the entity's TLPT. The contract term itself is checked in the ICT Third-Party Arrangements Register — Working Copy and the DORA Documentation & Evidence Checklist
DORA — Delegated Regulation (EU) 2024/1774Article 25(1) — “When testing the ICT business continuity plans in accordance with Article 11(6), of Regulation (EU) 2022/2554, financial entities shall take into account the financial entity’s business impact analysis (BIA) and the ICT risk assessment referred to in Article 3(1), point (b), of this Regulation.”Programme sheet, DT-14: the test takes the business impact analysis and the ICT risk assessment into account (Delegated Regulation 2024/1774 Article 25)
DORA — Delegated Regulation (EU) 2024/1774Article 25(2) — the testing assesses whether the entity can ensure the continuity of its critical or important functions, “performed on the basis of test scenarios that simulate potential disruptions, including an adequate set of severe but plausible scenarios”, includes ICT services provided by ICT third-party service providers where applicable, includes switchover scenarios for entities other than microenterprises, and is “designed to challenge the assumptions on which the business continuity plans are based, including governance arrangements and crisis communication plans”Programme sheet, DT-14: the scenarios, including switchover scenarios for entities that are not microenterprises, and any services of ICT third-party providers
DORA — Delegated Regulation (EU) 2024/1774Article 25(5) — “Financial entities shall document the results of the testing referred to in paragraph 1. Any identified deficiencies resulting from that testing shall be analysed, addressed, and reported to the management body.”Test log and Programme sheets: the results are documented, and deficiencies are analysed, addressed and reported to the management body through the gap tracker
DORA — Delegated Regulation (EU) 2024/1774Article 36 — for the entities of DORA Article 16(1), an ICT security testing plan that validates the effectiveness of the ICT security measures and considers the threats and vulnerabilities identified in the simplified framework; the results are monitored and evaluated, and the measures updated without undue delay for systems supporting critical or important functionsProfile and counts sheet and Systems sheet: for an Article 16 entity, the security testing plan and its results for systems that support critical or important functions
DORA — Delegated Regulation (EU) 2024/1774Article 40(1) — the entities under the simplified framework test their business continuity plans, including the scenarios referred to in Article 39, “at least once every year for the back-up and restore procedures, or upon every major change of the business continuity plan”Programme sheet, DT-14: for an Article 16 entity, the yearly test of the business continuity plans for the backup and restore procedures
DORA — Delegated Regulation (EU) 2024/1774Article 40(3) — the results of the testing are documented, and identified deficiencies “shall be analysed, addressed, and reported to the management body”Programme sheet: the results of the testing are documented and deficiencies are reported to the management body
DORA — Delegated Regulation (EU) 2025/1190Article 2 — TLPT authorities assess whether a financial entity must perform TLPT on impact and systemic character (size, interconnectedness, criticality and substitutability of its services, complexity, group) and on ICT risk factors (risk profile, threat landscape, dependence on ICT, complexity of architecture, third-party arrangements, supervisory reviews, maturity of continuity plans and of detection and mitigation); they require TLPT, unless the assessment shows it is not justified, of credit institutions that are G-SIIs, O-SIIs or part of them, payment institutions that exceeded EUR 150 billion of total payment transactions in each of the 2 calendar years before the assessment, electronic money institutions above EUR 150 billion of payment transactions or EUR 40 billion of outstanding electronic money, central securities depositories, central counterparties, trading venues above set market-share criteria, and insurance and reinsurance undertakings above set premium, provisions and asset criteriaProfile and counts sheet: the entities the Delegated Regulation names for TLPT, and the authority's assessment (DORA Art 26(8))
DORA — Delegated Regulation (EU) 2025/1190Article 9(1) and (2) — an entity identified to perform TLPT starts after the TLPT authority notifies it; within 3 months of the notification it submits the TLPT initiation information to the test managers: a project charter and plan, the control team lead’s contact details, the intended use of internal or external testers, the communication channels and a code nameTLPT sheet: the date of the authority's notice and the 3-month deadline for the initiation information
DORA — Delegated Regulation (EU) 2025/1190Article 10(3) and (4) — the control team lead selects at least three scenarios on the threat intelligence provider’s recommendation, the test managers’ input, feasibility and the entity’s size and risk profile; no more than one of them may be non-threat-ledTLPT sheet: the planning check for at least three scenarios, no more than one of them non-threat-led
DORA — Delegated Regulation (EU) 2025/1190Article 11(5) — the active red team testing phase is proportionate to the scope and scale, and “in any case shall last for at least 12 weeks”; testers report at least weekly to the control team and test managers (Article 11(7))TLPT sheet: the planning check for an active red team phase of at least 12 weeks
DORA — Delegated Regulation (EU) 2025/1190Article 12 — within 4 weeks of the end of the active red team testing phase the testers submit the red team test report; no later than 10 weeks after it the blue team submits its report and the blue team and testers replay the actions and hold a purple teaming exercise; within 8 weeks of the TLPT authority’s notification that the reports are adequate, the entity submits the summary report of findings to the TLPT authorityTLPT sheet: the deadlines for the red team report, the blue team report and replay, and the summary report
DORA — Delegated Regulation (EU) 2025/1190Article 13 — within 8 weeks of that notification the entity provides the remediation plans and the documentation under DORA Article 26(6); for each finding the plan gives the shortcoming, the measures with priority and expected completion, a root cause analysis, the staff or functions responsible, and the risks of not implementing the measuresTLPT sheet: the deadline for the remediation plans and the documentation

Editions referenced: ISO/IEC 27001:2022 incl. Amd 1:2024; NIST CSF 2.0; Regulation (EU) 2022/2554 (DORA); Delegated Regulations (EU) 2024/1772, 2024/1773, 2024/1774, 2025/301, 2025/532 and 2025/1190; Implementing Regulations (EU) 2024/2956 and 2025/302; as published in the Official Journal and read on 8 October 2026

ISO/IEC 27001 references name the clause or control this document relates to, by number and title only. They do not say that meeting one meets any DORA requirement.

These references show where this document supports an external framework. They indicate relevance only and do not reproduce the text of any standard.

This library does not say which ISO/IEC 27001 controls or NIST CSF outcomes meet a DORA requirement. It gives each article's own words, what an entity must be able to show, and the CISO Times documents that help with the work. Where the CISO Times Library holds a mapping between a DORA requirement and a control, it shows it there with how closely the two match and where they differ; confirm it against both texts before relying on it. A document listed here helps with the work a requirement describes. Using it does not by itself show that the requirement is met.

Say which text asks for what. No P21 document says that a CISO Times document, an ISO/IEC 27001 control or a NIST CSF outcome meets or maps to a DORA requirement.

Prepared by Zero One Cybersecurity · Published by CISO Times