How do we…
How do we run a weekly triage that doesn't turn into a two-hour argument?
Add to board memoOpen the memo
The short answer
- Recommendation
- Do the analysis before the meeting: propose a priority and owner for every new finding, group findings by fix, keep Priority 4 off the agenda and handle Priority 1 and 2 as they arrive. Run a timed agenda, take anything over two minutes offline, and let the standard owner settle disputes.
- Reasoning
- Long triage meetings come from doing the analysis in the room: arguing each priority from scratch, discovering who owns a system and reading scanner lines one by one. Priority is read from the rating model and owners come from the asset inventory, so neither needs debate. Escalation dates follow the deadline and are not negotiated. When the meeting overruns, the cause is usually in what reached the agenda, so fix the preparation.
- Considerations
- The 30-minute length, the time slots and the working-day targets are the defaults in the CISO Times vulnerability pack. Your own procedure may set different ones.
- Anyone may propose raising a priority. Only the standard owner may lower one, with a recorded reason, and never to avoid a missed deadline.
- A dispute not settled in the room goes to the standard owner, who decides within 2 working days in the pack's default. The deadline keeps running from first detection meanwhile.
- Findings escalated often usually point to a capacity problem. That belongs in the monthly report, not in the triage room.
The decision, step by step
Select any step for the reasoning behind it and where the pack covers it.
- Start
- Step
- Decision
- Outcome
- Loop back
Keyboard: Tab to a step, arrow keys move along the flow, Enter pins its explanation, + and − zoom, 0 fits the diagram, Esc closes. The text version below has the same content.
Where a step quotes a number, it is the default in the CISO Times pack. Your own standard may set a different one.
Read as text
The same flow written out: each step, its reasoning and where the pack covers it. 20 steps.
Start
The weekly triage keeps turning into a long argument
Long triage meetings usually come from doing the analysis in the room: arguing each finding's priority from scratch, discovering who owns a system, and walking through hundreds of scanner lines. The routine the pack describes is 30 minutes a week. The preparation before it and the follow-up after it are what make 30 minutes enough.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedurePurpose
Step
Prepare the day before, outside the meeting
The triage lead checks that last week's scans ran, exports new findings, and proposes a priority and an owner for each using the rating model and the asset inventory. A finding already open keeps its original detection date. The pack allows 60 to 90 minutes a week for this once the routine is established, finished by the end of the working day before.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 1 — Prepare (before the meeting)
Step
Group findings by the fix, one ticket per owner
Hundreds of new findings a week usually come from one or two missing updates across many systems. Group findings that one action will fix into one ticket per owner, and keep each finding's own deadline. Thirty-two servers missing the same update become one line on the agenda.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 1 — Prepare (before the meeting)
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureWorked example — one week's triage
Step
Keep Priority 4 findings off the agenda
Priority 4 findings are not discussed one by one. They go in bulk to the owner's normal patch cycle and appear on the agenda only when they are within 7 days of their deadline. In the pack's worked example this is why dozens of low-priority findings took no meeting time.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 1 — Prepare (before the meeting)
- P01-A06 Vulnerability Remediation TrackerInstructions
Step
Handle Priority 1 and 2 before the meeting
A Priority 1 finding never waits for the meeting; it goes straight to the emergency route. Priority 2 findings get an owner and a ticket within 2 working days of detection. The meeting then only confirms what was done. This also protects the deadlines: a finding found the day after a meeting has already used up to a week by the next one.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedurePriority 1 findings between meetings
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureProcedure steps
Step
Send a timed agenda to the owners of each item
The pack's slots: 5 minutes on Priority 1 and last week's actions, 10 on new Priority 1 to 3 findings, 10 on findings due within 7 days or overdue, and 5 on verifications, false positives, coverage and expiring exceptions. Invite the asset owners with an item on the agenda, and service providers or their written update. Hold the meeting even when attendance is thin; a short meeting with a record beats a cancelled one.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 2 — The 30-minute triage meeting
Decision
Is anyone disputing this item?
Owners who dispute a priority or ownership say so in the meeting, when the item comes up. These are the two disputes the procedure expects the meeting to settle. Treat each by its own rule, and do not let either become a debate about the whole method.
- Priority: Re-read the priority from the model's inputs
- Ownership: Take the owner from the asset inventory
- No dispute: Does the item need more than two minutes?
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureDecision points
Step
Re-read the priority from the model's inputs
The rating model is applied, not debated. Check the inputs: exploitation, exposure, severity and criticality. If an input is wrong, correct it and read the priority again. Anyone may propose raising a priority. Only the standard owner may lower one, with a recorded reason, and never to avoid a missed deadline.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureDecision points
- P01-A04 Vulnerability Risk Rating & SLA ModelRules for applying the model (rules RM-06, RM-07)
Step
Take the owner from the asset inventory
The owner is whoever the asset inventory names. If none is recorded, or the named owner disputes it, the standard owner assigns one. Every Priority 1 to 3 finding leaves the meeting with a named owner. Correct the inventory the same week so the same dispute does not come back; ownership disputes are the most common reason findings go unfixed.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureDecision points
Decision
Can the standard owner settle it in the room?
The standard owner attends when a priority, false positive or ownership needs deciding, and decides on the spot where the facts are clear. If the facts are missing, the room cannot supply them by arguing.
- Yes: Does the item need more than two minutes?
- No, or not known: Standard owner decides within 2 working days
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 2 — The 30-minute triage meeting
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureRoles
Step
Standard owner decides within 2 working days
An ownership or priority dispute not settled in the meeting goes to the standard owner, who decides within a set time. The pack's default is 2 working days. The deadline keeps running from first detection meanwhile, so the finding still needs someone working on it.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureEscalation
Decision
Does the item need more than two minutes?
The meeting is not a technical working session. Any item that needs more than two minutes of discussion is a sign the detail belongs elsewhere.
- Yes: Give it an owner and a date, and take it offline
- No: Is it due within 7 days, or already overdue?
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 2 — The 30-minute triage meeting
Step
Give it an owner and a date, and take it offline
Agree who will work it out and by when, and move on. The agreed action for each new finding is one of three: fix, apply a compensating control and fix, or request an exception.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 2 — The 30-minute triage meeting
Decision
Is it due within 7 days, or already overdue?
Findings close to their deadline, and those past it, are the ones that need a decision this week. Everything else only needs confirming.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 2 — The 30-minute triage meeting
Step
Ask for a date; escalation follows the calendar
Ask the owner for a fix date. Escalation dates follow from the deadline and are not negotiated in the meeting, which removes a whole class of argument. If the deadline cannot be met, agree who will request an exception, and by when; it must be before the deadline passes.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureDecision points
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureEscalation
- P01-A02 Vulnerability & Exposure Management Standard7. Exceptions (rule VM-16)
Decision
Are there items left on the agenda?
Work through the agenda in its time slots, item by item. Each item leaves with a decision, an owner, or a date for one.
- Yes: next item: Is anyone disputing this item? (back to an earlier step)
- No: Read back actions, then record and raise tickets
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 2 — The 30-minute triage meeting
Step
Read back actions, then record and raise tickets
Close by reading back the action list. Within 1 working day, raise or update each agreed ticket with asset, priority, owner, detection date and deadline. Send the escalations decided, and record the meeting: attendees, decisions, escalations and actions. The record is the evidence an auditor asks for.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 3 — After the meeting
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureTiming targets
Decision
Did the meeting fit in about 30 minutes?
In the pack's worked example, a week with an emergency, a false positive and an overdue finding took 26 minutes and produced six decisions and four actions. If yours regularly overruns, look first at the preparation, which is what makes 30 minutes enough.
- Yes: A short meeting with a written record, every week
- No: Fix what reached the agenda, not the meeting
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureWorked example — one week's triage
Step
Fix what reached the agenda, not the meeting
Look at what took the time. Ungrouped findings, Priority 4 lines, unresolved owners in the inventory and debates about the model all point back to preparation. Findings escalated often usually point to a capacity problem, which the pack says belongs in the monthly report, not in the triage room.
- Then: Prepare the day before, outside the meeting (back to an earlier step)
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureStage 1 — Prepare (before the meeting)
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureEscalation
Outcome
A short meeting with a written record, every week
Every new Priority 1 to 3 finding has a confirmed priority, a named owner and an agreed action. Late findings are escalated on their dates. The meeting record shows the routine ran and what was decided.
In the pack
- P01-A03 Vulnerability Triage & Remediation Operating ProcedureOutputs and records produced
- P01-A02 Vulnerability & Exposure Management Standard6. Remediation and verification (rule VM-12)
Practical checklist
- Prepare by the end of the working day before: check the scans ran, export new findings and propose a priority and owner for each.
- Group findings that one action fixes into one ticket per owner, keeping each finding's own deadline.
- Leave Priority 4 findings to the normal patch cycle until they are within 7 days of their deadline.
- Send Priority 1 findings to the emergency route at once, and raise Priority 2 tickets within 2 working days of detection.
- Send a timed agenda to the owners with items on it, and hold the meeting even when attendance is thin.
- Settle priority disputes from the model's inputs and ownership disputes from the inventory; give any item needing over two minutes an owner and a date.
- Ask for a fix date on anything due within 7 days or overdue, and agree exception requests before the deadline.
- Read back the actions, raise or update tickets within 1 working day, and record the meeting.
Evidence to have ready
- The weekly meeting record: date, attendees, decisions, escalations and actions with owners.
- Tickets showing asset, priority, owner, detection date and deadline.
- The recorded reason for every priority change, and the standard owner's decision on each dispute.
- The escalation messages, sent on their dates.
- Inventory corrections made after ownership disputes.
Assumptions
- You already rate findings with a priority model (“How do we decide what to fix first when the scanner shows thousands of findings?”) and hold an asset inventory with owners, even an incomplete one.
- The 30-minute length, the time slots and the working-day targets are the defaults in the CISO Times vulnerability pack. Your own procedure may set different ones.
Not covered here
- Whether to meet weekly or every two weeks. That is “When is weekly triage necessary, and when is fortnightly enough?”.
- When a fixed finding may be closed. That is “When is a finding closed: when the patch is applied, or when a rescan confirms it?”.
- What happens to a Priority 1 finding between meetings. That is “If a vulnerability affects a business-critical service, what happens next?”.
Related questions
- How do we decide what to fix first when the scanner shows thousands of findings?
- When is weekly triage necessary, and when is fortnightly enough?
- When is a finding closed: when the patch is applied, or when a rescan confirms it?
- If a vulnerability affects a business-critical service, what happens next?
- If the scanner reports a critical finding on a system nobody owns, then who fixes it?
- If remediation deadlines are routinely missed, do we change the deadline, the capacity or the scope?