Annual Control Testing Plan

Schedules tests across the year by control risk, audit calendar and resource availability.

Available soon

Format
Excel
Size
105 KB
Length
12 sheets
Version
1.0
Updated

What's inside

What changed

  1. 1.0

    Published.

Changes across this pack

Preview

The workbook's sheets as you will receive them, with its example rows and the values its formulas calculate. Highlighted [[text]] is for you to replace; rows marked EXAMPLE are for you to delete. Wide sheets scroll sideways. The cover, document control and changelog sheets are in the file.

Instructions

How to use this workbook

StepWhat to do
1On the Cycle Rules sheet, enter the day the plan year starts, the testing capacity in days a month and the effort settings. The values given are EXAMPLE figures; use your own.
2Check the cycles and sample bands on the Cycle Rules sheet (CA-05, CA-15). You may raise a sample or shorten a cycle, never the reverse. Under "Tests before this plan", list each control's last test, its period and conclusion. An owner's self-check is not a test (CA-10): leave it out.
3On the Controls sheet, copy each control from the Control Inventory & Ownership Register: name, frequency, runs a year, owner, key or not, risk rating and why it is Higher.
4For each Lower control, choose this plan year or the next, about half in each. Where an audit or review relies on a control, choose it in "Relied on by".
5On the Calendar sheet, list the year's audits, reviews and board meetings. Each that relies on test results gets a cut-off 6 weeks before it (CA-16).
6On the Plan sheet, add one row per test: month, control, kind (Operating, Design and Retest), tester and reviewer. Place the tests an audit relies on first: each must be final, its month's end plus the reviewer's 10 working days (CA-11), by the cut-off. Then spread the rest within capacity.
7Give each Higher control two tests six months apart. Plan a retest only once the fixed control has run enough to sample (CA-14), and enter when it began to run in "Period starts no earlier than", as for a new control.
8Choose testers who own and perform none of the controls they test (CA-10), and reviewers who neither tested nor own the control (CA-11). The Independence column checks against the owner only; check performers yourself.
9Plan a design check (kind Design) before a control's first operating test, at least every [[12]] months, and after it changes (CA-02).
10Clear every Check on the Controls and Plan sheets that does not say OK, and every month over capacity on the Calendar sheet.
11The assurance sponsor approves the plan before the year starts (CA-16). Record the approval, and every later change, at the foot of the Calendar sheet.
12Draft next year's plan on the Next Year sheet, starting with the Lower controls left for year two.
13To clear the EXAMPLE, delete the EXAMPLE rows and entries on every sheet. The formulas stay.

Legend

Yellow cells are inputs. Everything else is calculated or fixed — do not overwrite formulas.

EXAMPLERows marked EXAMPLE in the first column show how a completed row looks. Delete them before approval.

Rule CA-15: "Each control is rated Higher, Standard or Lower risk, and tested at least every 6, 12 or 24 months respectively. A control never tested is due within one cycle of the start of the first plan year, or of the day it started if that is later; one whose design was found deficient, within one cycle of the day its design is found adequate. A key control is never Lower, and a control that failed its last test is Higher until a retest passes."

Rule CA-16: "The sponsor approves the year's test plan before it starts, and any change to it is recorded. Tests that an audit, a supervisory review or a customer review will rely on are final at least [[6]] weeks before it starts."

This document helps you test whether your security controls work. It is not legal advice, and a test result is not a statement that you comply with NIS2, DORA, the GDPR or any standard. Where a law, a certification or a contract asks for an audit or an independent review, confirm with counsel, your certification body or the other party what it must include.

Control testing is not an internal audit, a certification audit, a P19 maturity assessment or a statement of compliance, and is never presented as one. Its results can feed each of them.

EXAMPLE: a wholesale distributor with about 900 staff, three warehouses and an online ordering service that takes 60% of its orders, an important entity under NIS2 in its Member State. Its control assurance lead, the Quality and Compliance Manager, owns no control; the Internal Audit Manager reviews the lead's. The pilot, TR-2026-P, tested 2026-03 to 2026-08. The Chief Operating Officer approved this plan for 1 Oct 2026 to 30 Sep 2027 on 30 Sep 2026. The largest customer's security review on 14 Jun 2027 relies on 5 controls.

Tailoring — small organisation: keep each control's cycle, and find a tester outside the function that owns it: a colleague from finance or operations, internal audit, or a contracted tester. Two people can test each other's controls, never their own.

Tailoring — regulated entity (NIS2, DORA): keep each approved plan and its changes, and share the plan with your internal auditors so their audit can draw on the tests. It is not their audit plan (CA-18).

Tailoring — IT run by a service provider: a control the provider runs is still yours to test. Agree in the contract that your tester can take populations and evidence from its systems.

This workbook is your own record. Keep it with the control inventory, the workpapers and the deficiency tracker.

Cycle Rules

Cycle rules and settings

The settings the plan calculates from, how often each rating is tested, the sample for each population, how each test's period is worked out, and each control's last test before this plan. Yellow cells are yours; EXAMPLE values show a completed plan.

Plan year starts1 Oct 2026EXAMPLE: the first day of the plan year. The sponsor approves the plan before it (CA-16).
Plan year ends (calc)30 Sep 2027Twelve months on.
Next plan year ends (calc)30 Sep 2028The Next Year sheet drafts the year after.
Weeks before an audit or review that relies on tests6CA-16. The pack's default; you may lengthen it.
Testing capacity (days a month)6EXAMPLE: the days a month your testers can give to testing, all testers together.
Hours in a testing day7.5EXAMPLE value; set your own. Turns the capacity in days into hours.
Set-up and write-up hours per test4EXAMPLE value; set your own. Taking and checking the population, choosing the sample, the workpaper and the review notes.
Hours per sampled item0.5EXAMPLE value; set your own. Finding and inspecting the evidence for one sampled occurrence, every attribute.
Reviewer signs within (working days)10CA-11. A test is final when the reviewer signs: its month's end plus these working days.
Testing capacity (hours a month) (calc)45Days a month times hours in a day. The Calendar compares each month's estimated hours with it.

How often each rating is tested (CA-15)

RatingTest at least every (months)Sample columnTests in a plan year (calc)When a control has this rating
Higher6Higher2A key control on which a risk outside appetite, or an obligation the organisation has recorded as not met, rests; or a control that failed its last test.
Standard12Standard1Any other key control.
Lower24Standard1 every 2 yearsA control that is not key. Its design is still checked every 12 months (CA-02).

A key control is never Lower, and a control that failed its last test is Higher until a retest passes (CA-15). Lower controls take the Standard sample column. A Lower control's design is still checked every [[12]] months (CA-02).

The sample for each population (CA-05)

Occurrences in the period, fromtoStandard and LowerHigherTypical control
12AllAllAn annual control, or a quarterly one tested over six months
31223A quarterly or monthly control
1352510A weekly control, or events a few times a month
532502030A daily control, or events most working days
251or more2540A control that runs many times a day

"All": test every occurrence, as when the population is no larger than the sample (CA-05). The tester takes the real population from the system of record (CA-04).

How each test's period is worked out (CA-06)

StepRule
1It ends on the last day of the month before the test's month.
2It starts the day after the last tested period ended: an earlier row on this plan, or a test below concluded Effective and Not effective.
3It never starts more than one test cycle before it ends (CA-06). A control never tested starts there.
4It never starts before "Period starts no earlier than": when the control started, or a fixed control began to run (CA-14).
5The latest of steps 2, 3 and 4 is the start. A design check has no period: it walks one occurrence through (CA-02).

Final by: a test is final when its reviewer signs (CA-11), so the plan allows 10 working days after its month ends. A test an audit relies on must be final by the audit's cut-off (CA-16).

Tests before this plan

Control IDTestPeriod fromPeriod toDesignOperating conclusion
CT-16EXAMPLE: WP-2026-011 Mar 202631 Aug 2026AdequateEffective
CT-13EXAMPLE: WP-2026-021 Mar 202631 Aug 2026AdequateNot effective
CT-22EXAMPLE: WP-2026-031 Mar 202631 Aug 2026AdequateEffective
CT-04EXAMPLE: WP-2026-041 Mar 202631 Aug 2026AdequateEffective
CT-24EXAMPLE: WP-2026-051 Mar 202631 Aug 2026AdequateEffective
CT-20EXAMPLE: WP-2026-061 Mar 202631 Aug 2026AdequateNot tested
CT-02EXAMPLE: WP-2026-071 Mar 202631 Aug 2026DeficientNot tested

EXAMPLE: the pilot round TR-2026-P, from the Control Test Workpaper Templates. Only a test concluded Effective and Not effective ends a tested period. CT-20 was Not tested: the control started when the Tier 0 accounts went live (P14). CT-02's design was Deficient, so its operation waits for the fix (CA-01).

Controls

One row per control in the Control Inventory & Ownership Register: its rating, how many tests this plan year needs (CA-15), how many are planned, and when the next falls due. Yellow columns are yours. Every status is a word; the colour only repeats it.

RowControl IDControlFrequencyRuns a yearOwnerKeyRiskWhy HigherLower: tested inRelied on byCycle in months (calc)Tests needed (calc)Tests planned (calc)Last period ended (calc)Next test due (calc)Check (calc)
EXAMPLECT-01Board report from checked figuresQuarterly4Head of Information SecurityYesStandard121130 Nov 202630 Nov 2027OK
EXAMPLECT-02Policy reviews on timeAs it falls due12Head of Information SecurityYesHigherThe board recorded NIS2 measure (h), cryptography, as outstanding until its policy is approved (P12, 30 Jul 2026)62230 Jun 202730 Dec 2027OK
EXAMPLECT-03Joiners acknowledge policiesAs it happens120HR DirectorYesStandard121130 Sep 202630 Sep 2027OK
EXAMPLECT-04Quarterly risk reviewQuarterly48Head of Information SecurityYesStandard121130 Jun 202730 Jun 2028OK
EXAMPLECT-05Exceptions approved and renewed in timeAs it happens10Head of Information SecurityYesStandard121130 Sep 202630 Sep 2027OK
EXAMPLECT-06Monthly exception register reviewMonthly12Head of Information SecurityNoLowerThis plan year241130 Nov 202630 Nov 2028OK
EXAMPLECT-07Tier 1 suppliers reassessed in timeAs it falls due14Information Security ManagerYesHigherR-02, payment fraud through a compromised supplier email account, is outside appetite (P05)62230 Apr 202730 Oct 2027OK
EXAMPLECT-08Metric inputs checked before reportingMonthly12Head of Information SecurityNoLowerThis plan year241131 Jan 202731 Jan 2029OK
EXAMPLECT-09NIS2 readiness self-assessedEvery six months2Head of Information SecurityYesStandard121131 Jan 202731 Jan 2028OK
EXAMPLECT-10Board members trainedAs it falls due7Board secretaryYesStandard121130 Apr 202730 Apr 2028OK
EXAMPLECT-11Information register reviewedAs it happens30Head of Information SecurityNoLowerThis plan year241131 May 202731 May 2029OK
EXAMPLECT-12Disposal certificates collectedAs it happens12Head of ITNoLowerNext plan year2401OK
EXAMPLECT-13Urgent vulnerabilities fixed in timeAs it happens70Head of ITYesHigherFailed its last test (TR-2026-P)Customer security review62231 Jul 202731 Jan 2028OK
EXAMPLECT-14Vendor releases reviewedAs it happens150Head of ITNoLowerNext plan year2401OK
EXAMPLECT-15Missed patch deadlines deferredAs it happens6Head of ITYesStandard121131 Dec 202631 Dec 2027OK
EXAMPLECT-16Leavers' access removedAs it happens80Head of ITYesStandardCustomer security review121128 Feb 202728 Feb 2028OK
EXAMPLECT-17Movers' old access removedAs it happens40Head of ITYesStandard121131 Oct 202631 Oct 2027OK
EXAMPLECT-18Monthly account reconciliationMonthly12Head of ITYesStandard121130 Nov 202630 Nov 2027OK
EXAMPLECT-19User access reviewsEvery six months2Head of Information SecurityYesStandardCustomer security review121128 Feb 202728 Feb 2028OK
EXAMPLECT-20Privileged access reviewedQuarterly4Head of ITYesStandard121131 Dec 202631 Dec 2027OK
EXAMPLECT-21Break-glass accounts tested and every use reviewedQuarterly4Head of Information SecurityYesStandard121131 Mar 202731 Mar 2028OK
EXAMPLECT-22Security induction completedAs it happens120Information Security ManagerYesStandardCustomer security review121128 Feb 202728 Feb 2028OK
EXAMPLECT-23Annual security course completedAs it falls due900Information Security ManagerYesStandard121130 Jun 202730 Jun 2028OK
EXAMPLECT-24Post-incident review heldAs it happens3Information Security ManagerYesStandardCustomer security review121128 Feb 202728 Feb 2028OK
EXAMPLECT-25Incident response exercisedAs it falls due6Head of Information SecurityYesStandard121131 May 202731 May 2028OK
EXAMPLECT-26After-action report approvedAs it happens3Chief Operating OfficerNoLowerNext plan year2401OK
EXAMPLECT-27Notification readiness checkedEvery six months2Head of Information SecurityYesStandard121130 Apr 202730 Apr 2028OK
EXAMPLECT-28Maturity assessed each yearAnnual1Head of Information SecurityYesStandard121130 Sep 202630 Sep 2027OK
EXAMPLECT-29Supplier High findings escalatedAs it happens4Information Security ManagerYesStandard121131 May 202731 May 2028OK
EXAMPLECT-30Triggered risk reassessmentAs it happens6Head of Information SecurityYesStandard121131 May 202731 May 2028OK

Plan

One row per test, by the month its fieldwork runs. Yellow columns are yours; the control's details, the testing period (CA-06), the population, the sample (CA-05), the hours and the checks calculate.

RowMonthControl IDControl (calc)Owner (calc)Risk (calc)KindTesterReviewerPeriod starts no earlier thanLast period ended (calc)Period from (calc)Period to (calc)Runs a year (calc)Estimated population (calc)Sample (calc)Estimated hours (calc)Final by (calc)Relied on byCut-off check (calc)Independence (calc)NoteCheck (calc)
EXAMPLE1 Oct 2026CT-03Joiners acknowledge policiesHR DirectorStandardOperatingInformation Security ManagerQuality and Compliance Manager1 Oct 202530 Sep 2026120120201413 Nov 2026IndependentOK
EXAMPLE1 Oct 2026CT-05Exceptions approved and renewed in timeHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Oct 202530 Sep 202610102513 Nov 2026IndependentOK
EXAMPLE1 Oct 2026CT-28Maturity assessed each yearHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Oct 202530 Sep 20261114.513 Nov 2026IndependentOK
EXAMPLE1 Nov 2026CT-07Tier 1 suppliers reassessed in timeInformation Security ManagerHigherOperatingQuality and Compliance ManagerInternal Audit Manager1 May 202631 Oct 202614735.514 Dec 2026IndependentHigher: first of twoOK
EXAMPLE1 Nov 2026CT-17Movers' old access removedHead of ITStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Nov 202531 Oct 2026404056.514 Dec 2026IndependentOK
EXAMPLE1 Dec 2026CT-01Board report from checked figuresHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Dec 202530 Nov 2026442514 Jan 2027IndependentOK
EXAMPLE1 Dec 2026CT-18Monthly account reconciliationHead of ITStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Dec 202530 Nov 202612122514 Jan 2027IndependentOK
EXAMPLE1 Dec 2026CT-06Monthly exception register reviewHead of Information SecurityLowerOperatingQuality and Compliance ManagerInternal Audit Manager1 Dec 202430 Nov 2026122456.514 Jan 2027IndependentOK
EXAMPLE1 Jan 2027CT-02Policy reviews on timeHead of Information SecurityHigherDesignQuality and Compliance ManagerInternal Audit Manager1214.512 Feb 2027IndependentDF-02: design re-checked once the register exists. This design check counts as one of CT-02's two Higher tests this year: its operation cannot be tested until the design is fixed (CA-01), so the operating retest in July is the otherOK
EXAMPLE1 Jan 2027CT-20Privileged access reviewedHead of ITStandardOperatingQuality and Compliance ManagerInternal Audit Manager21 Sep 202621 Sep 202631 Dec 20264114.512 Feb 2027IndependentFirst review due by 21 Dec 2026OK
EXAMPLE1 Jan 2027CT-15Missed patch deadlines deferredHead of ITStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Jan 202631 Dec 2026662512 Feb 2027IndependentOK
EXAMPLE1 Feb 2027CT-13Urgent vulnerabilities fixed in timeHead of ITHigherRetestQuality and Compliance ManagerInternal Audit Manager2 Nov 202631 Aug 20262 Nov 202631 Jan 2027701710912 Mar 2027Customer security reviewFinal by the cut-offIndependentDF-01 retest; Higher: first of twoOK
EXAMPLE1 Feb 2027CT-08Metric inputs checked before reportingHead of Information SecurityLowerOperatingQuality and Compliance ManagerInternal Audit Manager1 Feb 202531 Jan 2027122456.512 Mar 2027IndependentOK
EXAMPLE1 Feb 2027CT-09NIS2 readiness self-assessedHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Feb 202631 Jan 2027222512 Mar 2027IndependentOK
EXAMPLE1 Mar 2027CT-16Leavers' access removedHead of ITStandardOperatingQuality and Compliance ManagerInternal Audit Manager31 Aug 20261 Sep 202628 Feb 2027804056.514 Apr 2027Customer security reviewFinal by the cut-offIndependentBefore the customer reviewOK
EXAMPLE1 Mar 2027CT-22Security induction completedInformation Security ManagerStandardOperatingQuality and Compliance ManagerInternal Audit Manager31 Aug 20261 Sep 202628 Feb 202712060201414 Apr 2027Customer security reviewFinal by the cut-offIndependentBefore the customer reviewOK
EXAMPLE1 Mar 2027CT-19User access reviewsHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Mar 202628 Feb 2027222514 Apr 2027Customer security reviewFinal by the cut-offIndependentBefore the customer reviewOK
EXAMPLE1 Mar 2027CT-24Post-incident review heldInformation Security ManagerStandardOperatingQuality and Compliance ManagerInternal Audit Manager31 Aug 20261 Sep 202628 Feb 20273114.514 Apr 2027Customer security reviewFinal by the cut-offIndependentBefore the customer reviewOK
EXAMPLE1 Apr 2027CT-21Break-glass accounts tested and every use reviewedHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Apr 202631 Mar 2027442514 May 2027IndependentOK
EXAMPLE1 Apr 2027CT-12Disposal certificates collectedHead of ITLowerDesignQuality and Compliance ManagerInternal Audit Manager1214.514 May 2027IndependentLower: design checked each year (CA-02); operation tested next yearOK
EXAMPLE1 May 2027CT-07Tier 1 suppliers reassessed in timeInformation Security ManagerHigherOperatingQuality and Compliance ManagerInternal Audit Manager31 Oct 20261 Nov 202630 Apr 202714735.514 Jun 2027IndependentHigher: second of twoOK
EXAMPLE1 May 2027CT-10Board members trainedBoard secretaryStandardOperatingInformation Security ManagerQuality and Compliance Manager1 May 202630 Apr 2027772514 Jun 2027IndependentOK
EXAMPLE1 May 2027CT-27Notification readiness checkedHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 May 202630 Apr 2027222514 Jun 2027IndependentOK
EXAMPLE1 Jun 2027CT-25Incident response exercisedHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Jun 202631 May 2027662514 Jul 2027IndependentOK
EXAMPLE1 Jun 2027CT-29Supplier High findings escalatedInformation Security ManagerStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Jun 202631 May 2027442514 Jul 2027IndependentOK
EXAMPLE1 Jun 2027CT-30Triggered risk reassessmentHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Jun 202631 May 2027662514 Jul 2027IndependentOK
EXAMPLE1 Jun 2027CT-11Information register reviewedHead of Information SecurityLowerOperatingQuality and Compliance ManagerInternal Audit Manager1 Jun 202531 May 20273060201414 Jul 2027IndependentOK
EXAMPLE1 Jul 2027CT-02Policy reviews on timeHead of Information SecurityHigherRetestQuality and Compliance ManagerInternal Audit Manager1 Feb 20271 Feb 202730 Jun 202712535.513 Aug 2027IndependentDF-02 operating retest; HigherOK
EXAMPLE1 Jul 2027CT-04Quarterly risk reviewHead of Information SecurityStandardOperatingQuality and Compliance ManagerInternal Audit Manager31 Aug 20261 Sep 202630 Jun 2027484056.513 Aug 2027IndependentOK
EXAMPLE1 Jul 2027CT-23Annual security course completedInformation Security ManagerStandardOperatingQuality and Compliance ManagerInternal Audit Manager1 Jul 202630 Jun 20279009002516.513 Aug 2027IndependentOK
EXAMPLE1 Aug 2027CT-13Urgent vulnerabilities fixed in timeHead of ITHigherOperatingQuality and Compliance ManagerInternal Audit Manager31 Jan 20271 Feb 202731 Jul 2027703510914 Sep 2027IndependentHigher: second of twoOK
EXAMPLE1 Aug 2027CT-14Vendor releases reviewedHead of ITLowerDesignQuality and Compliance ManagerInternal Audit Manager15014.514 Sep 2027IndependentLower: design checked each year (CA-02); operation tested next yearOK
EXAMPLE1 Sep 2027CT-26After-action report approvedChief Operating OfficerLowerDesignQuality and Compliance ManagerInternal Audit Manager314.514 Oct 2027IndependentLower: design checked each year (CA-02); operation tested next yearOK

Next Year

Next year's draft, with the same columns and formulas. Its periods start where this year's tests end. It starts with the Lower controls left for year two; add the rest as the year goes on.

RowMonthControl IDControl (calc)Owner (calc)Risk (calc)KindTesterReviewerPeriod starts no earlier thanLast period ended (calc)Period from (calc)Period to (calc)Runs a year (calc)Estimated population (calc)Sample (calc)Estimated hours (calc)Final by (calc)Relied on byCut-off check (calc)Independence (calc)NoteCheck (calc)
EXAMPLECT-12Disposal certificates collectedHead of ITLowerOperating12Name the testerLower: left for year two of its 24-month cycle. Choose the month.Enter the month
EXAMPLECT-14Vendor releases reviewedHead of ITLowerOperating150Name the testerLower: left for year two of its 24-month cycle. Choose the month.Enter the month
EXAMPLECT-26After-action report approvedChief Operating OfficerLowerOperating3Name the testerLower: left for year two of its 24-month cycle. Choose the month.Enter the month

Calendar

Calendar

Where the plan stands; the audits, reviews and board meetings it works to, with each cut-off (CA-16); tests and hours by month against capacity; and the plan's approval and changes. Yellow cells are yours.

EXAMPLE: the distributor's plan for 1 Oct 2026 to 30 Sep 2027.

Where the plan stands

MeasureValueWhat it means
Tests planned33Rows on the Plan sheet, of every kind.
Controls with a test this plan year30 of 30From the Controls sheet.
Lower controls left for next year3On the Next Year sheet.
Tests an audit or review relies on, final by its cut-off5 of 5CA-16: final at least 6 weeks before it starts.
Tests with an independent tester and reviewer33 of 33CA-10 and CA-11: neither owns the control, and the reviewer did not test it.
Months over capacity0From the months table below.
Plan rows to resolve0Rows on the Plan sheet whose Check does not say OK.
Control rows to resolve0Rows on the Controls sheet whose Check does not say OK.
Estimated hours in the plan year217All tests together.
ApprovalApproved before the year startsThe sponsor approves the plan before the year starts (CA-16).

Audits, reviews and board meetings the plan works to (CA-16)

NameDateRelies on test resultsCut-off (calc)Tests relied on (calc)Final by the cut-off (calc)Plan tests final by the date (calc)What it is
Customer security review14 Jun 2027Yes3 May 202755 of 523EXAMPLE: The largest customer's annual supplier security review. It relies on the controls marked on the Controls sheet.
Maturity assessment17 Sep 2027Yes6 Aug 2027032EXAMPLE: The next full maturity assessment (P19): fieldwork ends by this date. It can draw on tests final by the cut-off (CA-18).
Board meeting29 Oct 2026No00EXAMPLE: The quarter's board meeting, which receives the pilot's results through the board report.
[[e.g. certification surveillance audit, or a supervisor's review]]0

Cut-off: the date minus 6 weeks (the setting on the Cycle Rules sheet). "Plan tests final by the date" counts every test final by then, relied on or not: what the meeting or review can see.

Tests and hours by month, against capacity

MonthTestsRetestsDesign checksSampled itemsEstimated hoursCapacity hoursHours to spareStatus
1 Oct 20263002323.54521.5Within capacity
1 Nov 20262008124533Within capacity
1 Dec 2026300916.54528.5Within capacity
1 Jan 20273014144531Within capacity
1 Feb 20273101720.54524.5Within capacity
1 Mar 202740028304515Within capacity
1 Apr 202720139.54535.5Within capacity
1 May 2027300715.54529.5Within capacity
1 Jun 202740026294516Within capacity
1 Jul 20273103328.54516.5Within capacity
1 Aug 20272011113.54531.5Within capacity
1 Sep 202710114.54540.5Within capacity
Plan year3324170217540323

Each test's hours: set-up and write-up hours per test, plus hours per sampled item times its sample (settings on the Cycle Rules sheet). A month over capacity needs a test moved, a second tester, or more days.

Approval and changes (CA-16)

RoleName or bodyDateCheck (calc)
Proposed by (Control assurance lead)EXAMPLE: Quality and Compliance Manager[[YYYY-MM-DD]]
Approved by (Assurance sponsor)EXAMPLE: Chief Operating Officer30 Sep 2026Approved before the year starts
DateWhat changedWhyApproved by
[[YYYY-MM-DD]][[e.g. CT-17 moved from November to January]][[e.g. the access coordinator's absence]][[Assurance sponsor]]

Record every change after approval: a test moved, added after a significant incident or change, or dropped. Tests an audit relies on stay before its cut-off.

Lists

KindYesNoLowerWhenFrequencyDesignConclusionOperatingConclusion
OperatingYesThis plan yearAs it happensAdequateEffective
DesignNoNext plan yearAs it falls dueDeficientNot effective
RetestMonthlyNot tested

Quarterly

Every six months

Annual

Definitions

Definitions

TermMeaning in this workbook
ControlSomething done routinely to keep a risk in check, written as who does what, how often, and the record it leaves (CA-01).
Key controlA control whose failure, on its own, would let a risk on the register happen or go unnoticed, or that the organisation names as its evidence for an obligation. Key controls are never rated Lower risk.
Control ownerThe manager accountable for a control running and leaving its record. Agrees test dates, provides access to records and fixes deficiencies.
TesterThe person who tests a control. Owns and performs none of the controls they test (CA-10).
Control assurance leadThe person who runs control testing: keeps the inventory and the plan, assigns testers, reviews workpapers, and rates deficiencies. Owns and performs no control in scope.
Assurance sponsorThe member of management who approves the test plan, receives the dashboard, and decides when a High deficiency is overdue.
Risk ratingHigher, Standard and Lower, given by CA-15. What earns each is on the Cycle Rules sheet.
Test cycleThe longest time between operating tests of a control: 6 months for Higher, 12 months for Standard, 24 months for Lower (CA-15).
Design checkA check that the control, as written and as set up, would prevent or detect the risk if it ran: a walkthrough of one occurrence from start to record (CA-02).
Operating testA check, on a sample chosen by the tester, that the control ran as designed throughout the testing period (CA-04 to CA-07).
RetestAn operating test of a fixed control, made after it has run enough times to sample, by someone other than its owner. A deficiency closes only on a retest that passes (CA-14).
Testing periodThe months the operating test covers: since the control was last tested, and never longer than its test cycle (CA-06).
Estimated populationHow many times the control is expected to run in the testing period: the times it runs a year, scaled to the period's days. For planning only; the tester takes the real population from the system of record.
SampleThe occurrences the tester chooses from the population, spread across the testing period. The owner never chooses them (CA-04, CA-05).
Estimated hoursSet-up and write-up hours per test, plus hours per sampled item times the sample. For planning capacity, not for charging.
Final byThe last day of the test's month plus the reviewer's 10 working days (CA-11): the latest day the reviewer signs the workpaper, when the test becomes final. Public holidays are not counted out.
Relied on byThe audit or review that will use this test's result, from the Calendar. Its tests must be final by its cut-off.
Cut-offThe date 6 weeks before an audit or review starts, by which every test it relies on is final (CA-16).
CapacityThe days a month your testers can give to testing, as hours. Each month's estimated hours are compared with it.
Next test dueThe last tested period's end plus the control's test cycle: the date by which its next operating test's period must end (CA-15).
Plan yearThe twelve months the sponsor approves the plan for. The next plan year is drafted on the Next Year sheet.
(calc)A column or cell the workbook calculates. Do not type or paste over it.
CA-nnThe rules of the Control Testing Methodology, CA-01 to CA-20. CT-nn are its controls, quoted in the Control Inventory & Ownership Register.
EXAMPLEA worked example: a wholesale distributor with about 900 staff, three warehouses and an online ordering service that takes 60% of its orders. Its plan for 1 Oct 2026 to 30 Sep 2027. Clear the EXAMPLE before use.

Framework References

Framework references

These references indicate relevance only and do not reproduce the text of any standard.

FrameworkReferenceSupported by
ISO/IEC 27001:2022Annex A 5.35 — Independent review of information securityThe plan as a whole: control tests at planned intervals by a tester independent of the control, whose results can feed the independent review. The plan is not that review (CA-18)
NIST CSF 2.0ID.IM-01 — “Improvements are identified from evaluations”Plan sheet: the evaluations the year's improvements are identified from, scheduled by risk
NIS2 — Directive (EU) 2022/2555Article 21(2)(f) — “policies and procedures to assess the effectiveness of cybersecurity risk-management measures”The plan as a whole: when each control's effectiveness is assessed, how often by its risk rating (CA-15), and by whom (CA-10)
NIS2 — Implementing Regulation (EU) 2024/2690Article 1 — lays down the technical and methodological requirements of the Article 21(2) measures, and further specifies when an incident is significant, for DNS service providers, TLD name registries, cloud computing, data centre and content delivery network providers, managed service and managed security service providers, providers of online marketplaces, online search engines and social networking services platforms, and trust service providersApplies to the providers its Article 1 names. For them, the Annex points below; for others, a useful guide only
NIS2 — Implementing Regulation (EU) 2024/2690Annex, point 2.2.3 — “The relevant entities shall perform the compliance monitoring at planned intervals and when significant incidents or significant changes to operations or risks occur.”Plan sheet: tests at planned intervals by rating, and sooner after a significant incident or change
NIS2 — Implementing Regulation (EU) 2024/2690Annex, point 7.3 — review and, where appropriate, update the policy and procedures at planned intervals and after significant incidents or significant changes to operations or risksCalendar sheet: the plan approved each year, and every change recorded (CA-16)
DORA — Regulation (EU) 2022/2554Article 5(2)(f) — the management body shall “approve and periodically review the financial entity’s ICT internal audit plans, ICT audits and material modifications to them”Calendar sheet, for financial entities: the plan's approval can sit beside the ICT internal audit plans; it is not one of them (CA-18)
DORA — Regulation (EU) 2022/2554Article 6(6) — “The ICT risk management framework of financial entities, other than microenterprises, shall be subject to internal audit by auditors on a regular basis in line with the financial entities’ audit plan.” The auditors possess sufficient knowledge, skills and expertise in ICT risk and appropriate independence, and the frequency and focus of ICT audits are commensurate to the entity’s ICT riskCalendar sheet, for financial entities: tests an internal audit relies on final before it (CA-16). Testing can feed that audit; it is not that audit (CA-18)
DORA — Delegated Regulation (EU) 2024/1774Article 28(5) — the simplified ICT risk management framework “is subject to an internal audit by auditors, in line with the financial entities’ audit plan”; the auditors have sufficient knowledge, skills and expertise in ICT risk “and shall be independent”, and the frequency and focus of ICT audits are commensurate to the entity’s ICT riskCalendar sheet, for financial entities under the simplified framework: as for Article 6(6). Testing is not the internal audit (CA-18)

Editions referenced: ISO/IEC 27001:2022 incl. Amd 1:2024; NIST CSF 2.0; Directive (EU) 2022/2555 (NIS2) and Implementing Regulation (EU) 2024/2690; Regulation (EU) 2022/2554 (DORA) and Delegated Regulation (EU) 2024/1774; Regulation (EU) 2016/679 (GDPR)

ISO/IEC 27001 references name the clause or control this document relates to. They do not say that meeting it meets any other framework's requirement.

These references show where this document supports an external framework. They indicate relevance only and do not reproduce the text of any standard.