NIS2 Gap & Remediation Tracker

Converts readiness gaps into owned, dated actions prioritised by supervisory exposure.

Available soon

Format
Excel
Size
81 KB
Length
10 sheets
Version
1.0
Updated

What's inside

What changed

  1. 1.0

    Published.

Changes across this pack

Preview

The workbook's sheets as you will receive them, with its example rows and the values its formulas calculate. Highlighted [[text]] is for you to replace; rows marked EXAMPLE are for you to delete. Wide sheets scroll sideways. The cover, document control and changelog sheets are in the file.

Instructions

How to use this workbook

StepWhat to do
1Set the As-at date and the date of the next management body meeting on the Summary sheet. The EXAMPLE uses 30 Sep 2026, the example quarter end; use today's date, or type =TODAY().
2After each self-assessment, enter the level of every item on the Readiness Items sheet. Its Check column shows any item below Operating with no open gap: raise one (NR-09).
3Raise one gap per item below Operating on the Gaps sheet: its ID (GAP-nn), the readiness item, the level it had when the gap was raised, and what is missing, as fact. The priority and the supervisory exposure calculate.
4Enter the change that closes the gap (the document, control or record it adds or changes), one owner, the effort, and the date raised: the date of the assessment. If a plan already set an earlier date, enter it as the earlier planned date. The due date calculates.
5Keep the status current: Open, agreed, not started. In progress, work started; due date unchanged. Done, the change is made and its record is filed; the item is re-rated at the next assessment. Withdrawn, dropped, with the management body's recorded reason.
6When a gap is Done, enter the date and where its record is filed, so the evidence checklist can point to it. The next self-assessment re-rates the item; do not change the level on the Readiness Items sheet until then.
7Report to the management body at least every quarter (NR-04), and report a Priority 1 gap at once (NR-10: "A blocking gap must be reported to the management body at its next meeting, or within [[10]] working days to its chair where the next meeting is later than that."). The Summary sheet shows what falls due before the next meeting.
8Delete the EXAMPLE rows on the Gaps sheet, and the EXAMPLE levels on the Readiness Items sheet, before the tracker is approved. Do not type over the white calculated columns.

Legend

Yellow cells are inputs. Everything else is calculated or fixed — do not overwrite formulas.

EXAMPLERows marked EXAMPLE in the first column show how a completed row looks. Delete them before approval.

NR-09: "Every gap must go into the gap tracker with one owner, a priority set by supervisory exposure, a due date and the change that closes it, and must be corrected without undue delay (Article 21(4))."

Why priority follows supervisory exposure: a supervisor weighs most a duty not met at all, and asks for evidence that measures are implemented (Article 32(2) and Article 33(2)). Priority 1 (Exposed now): A blocking gap: a duty NIS2 places on the entity directly is not in place at all. Priority 2 (Exposed on request): A blocking item that is in place but not operating: a request for evidence of implementation (Article 32(2)(g), Article 33(2)(f)) would find it incomplete. Priority 3 (Improvement): Any other item below Operating.

This document helps you apply NIS2's own tests to your facts. It is not legal advice. National law may add to the Directive or define terms more closely, so confirm the result with counsel before you rely on it.

EXAMPLE: a wholesale distributor with about 900 staff, three warehouses and an online ordering service that takes 60% of its orders. Its self-assessment of 30 Sep 2026 gave Not ready with 1 blocking gap and raised 7 gaps. Where a plan had already set an earlier date (the board member's booked training, the recovery rebuild, the supplier assessments, the patching action) the due date follows it. GAP-01 goes to the chair of the management body by 14 Oct 2026: the next meeting, on 29 Oct 2026, is 21 working days after the assessment, more than NR-10's 10 (NR-10).

Tailoring for a small organisation: one person may own most gaps. Keep one owner per gap all the same, and check the due dates against that person's real time: an overdue Priority 1 gap is the one a supervisor would find first.

Tailoring for a regulated entity: an essential entity may be supervised at any time (Article 32), so a Priority 2 gap is exposed as soon as a supervisor asks. A financial entity under DORA tracks the gaps against DORA's requirements in the same way, with counsel's view of which NIS2 provisions do not apply (Article 4(1)).

Tailoring for IT run by a service provider: where the provider must make the change, the owner is the person who manages the provider, and the change names the contract clause or the service request. A gap is Done only when you hold the provider's record.

Gaps

One row per gap, from the NIS2 Readiness Self-Assessment. Yellow columns are yours; priority, exposure, due date and flag calculate. Overdue is measured at the As-at date on the Summary sheet.

ExampleGap IDReadiness itemRequirementWhat is missingLevel when raisedBlocking item?PrioritySupervisory exposureChange that closes itOwnerEffortRaisedEarlier planned dateDueStatusDoneEvidenceDays overdueFlagOpen due (working)
EXAMPLEGAP-01RM-hArticle 21(2)(h): cryptography and encryptionNo written policy on the use of cryptography, encryption and key managementPlannedYesPriority 1Exposed nowWrite the policy and have the board approve it on 29 Oct 2026, completing its approval of the measures (NR-03)Head of Information SecuritySmall30 Sep 202630 Oct 2026In progressNot yet due
EXAMPLEGAP-02GV-03Every member of the management body trainedThe member appointed on 15 Jul 2026 is not yet trainedIn placeYesPriority 2Exposed on requestInduction training on 8 Oct 2026, recorded in the training planBoard secretarySmall30 Sep 202615 Oct 202615 Oct 2026OpenNot yet due
EXAMPLEGAP-03RM-cArticle 21(2)(c): business continuity and crisis managementThe ordering platform cannot yet be restored within 24 hours, and three critical services have no restore testIn placeYesPriority 2Exposed on requestRebuild the platform's recovery (P05 TA-01), then test a restore of every critical serviceHead of ITLarge30 Sep 202615 Dec 202615 Dec 2026OpenNot yet due
EXAMPLEGAP-04RM-dArticle 21(2)(d): supply chain securityFive Tier 1 suppliers not yet assessedIn placeYesPriority 2Exposed on requestComplete the five assessments booked for Q4 (P06)Information Security ManagerMedium30 Sep 20268 Dec 20268 Dec 2026In progressNot yet due
EXAMPLEGAP-05RM-eArticle 21(2)(e): security in acquisition, development and maintenancePriority 1 and 2 weaknesses fixed on time below targetIn placeYesPriority 2Exposed on requestBring patching of the ordering platform back within deadline (P05 TA-03)Head of ITMedium30 Sep 202631 Oct 202631 Oct 2026In progressNot yet due
EXAMPLEGAP-06RM-jArticle 21(2)(j): multi-factor authentication and secured communicationsSecond factors sent by text message can be phishedIn placeYesPriority 2Exposed on requestMove email and remote access to an authenticator app or security keysHead of ITMedium30 Sep 202629 Dec 2026OpenNot yet due
EXAMPLEGAP-07RM-gArticle 21(2)(g): cyber hygiene and trainingStaff awareness training below its target: 92% of staff trained against 95%In placeYesPriority 2Exposed on requestTrain the staff still to complete the course, starting with the warehouse shifts, and keep the completion record (P03 BM-08)HR Learning LeadSmall30 Sep 202629 Dec 2026In progressNot yet due

Readiness Items

The items of the NIS2 Readiness Self-Assessment, with the level each had at the latest assessment. Blocking items are duties NIS2 places on the entity directly. Add any item of your own on a blank row.

ExampleItem IDAreaRequirementBlocking?Latest levelOpen gapsCheck (NR-09)
EXAMPLESR-01Scope and registrationScope and classification decided and recordedYesOperating0OK
EXAMPLESR-02Scope and registrationRegistered with the competent authority, with details currentYesOperating0OK
EXAMPLEGV-01Management bodyThe management body approved the measuresYesOperating0OK
EXAMPLEGV-02Management bodyThe management body oversees the measuresYesOperating0OK
EXAMPLEGV-03Management bodyEvery member of the management body trainedYesIn place1OK
EXAMPLERM-aRisk-management measuresArticle 21(2)(a): risk analysis and security policiesYesOperating0OK
EXAMPLERM-bRisk-management measuresArticle 21(2)(b): incident handlingYesOperating0OK
EXAMPLERM-cRisk-management measuresArticle 21(2)(c): business continuity and crisis managementYesIn place1OK
EXAMPLERM-dRisk-management measuresArticle 21(2)(d): supply chain securityYesIn place1OK
EXAMPLERM-eRisk-management measuresArticle 21(2)(e): security in acquisition, development and maintenanceYesIn place1OK
EXAMPLERM-fRisk-management measuresArticle 21(2)(f): assessing effectivenessYesOperating0OK
EXAMPLERM-gRisk-management measuresArticle 21(2)(g): cyber hygiene and trainingYesIn place1OK
EXAMPLERM-hRisk-management measuresArticle 21(2)(h): cryptography and encryptionYesPlanned1OK
EXAMPLERM-iRisk-management measuresArticle 21(2)(i): people, access and assetsYesOperating0OK
EXAMPLERM-jRisk-management measuresArticle 21(2)(j): multi-factor authentication and secured communicationsYesIn place1OK
EXAMPLEIR-01Incident reportingSignificant incidents screened and reported on timeYesOperating0OK
EXAMPLESV-01SupervisionEvidence ready for a supervisorNoOperating0OK

Summary

Summary

Calculated from the Gaps sheet at the As-at date. Take it to the management body with the quarterly report (NR-04).

EXAMPLE: the example organisation's gaps. Delete the EXAMPLE rows to use your own.

As-at date30 Sep 2026EXAMPLE: the example quarter end. Use today's date, or type =TODAY().
Next management body meeting29 Oct 2026EXAMPLE: the next quarterly board.

Headline

MeasureResult
Open gaps (Open or In progress)7
Priority 1 open: blocking gaps1
Overdue0
Next due date15 Oct 2026
Next due gapGAP-02
Due on or before the next management body meeting1
Items below Operating with no open gap (NR-09)0

Gaps by priority

PriorityExposureDeadline (days)OpenIn progressDoneWithdrawnOverdueEarliest open due
Priority 1Exposed now300100030 Oct 2026
Priority 2Exposed on request903300015 Oct 2026
Priority 3Improvement18000000
All priorities3400015 Oct 2026

Open gaps by effort

EffortWhat it meansPriority 1 (blocking)Priority 2Priority 3All open
SmallUnder [[2]] weeks of work, inside one team, within budget.1203
Medium[[2]] to [[8]] weeks, or two or more teams, within budget.0303
LargeMore than [[8]] weeks, or money the budget does not hold.0101

Open gaps by owner

OwnerOpenOverdueEarliest open due
Head of Information Security1030 Oct 2026
Board secretary1015 Oct 2026
Head of IT3031 Oct 2026
Information Security Manager108 Dec 2026
HR Learning Lead1029 Dec 2026

Type each owner once, as the Gaps sheet names them. EXAMPLE: the owners of the seven example gaps.

Report to the management body

ItemEntry
Reported by (name, role) and date[[Name, role, YYYY-MM-DD]]
Priority 1 gaps reported under NR-10: to whom and whenEXAMPLE: GAP-01 to the chair of the management body by 2026-10-14, by the NIS2 lead; the next meeting, on 2026-10-29, is 21 working days away, more than 10. Status at 2026-09-30: due
Gaps withdrawn, with the management body's reason and minute reference[[e.g. none]]
Decisions asked of the management body[[e.g. approve the cryptography policy as part of the measures]]

Lists

ItemIDLevelEffortGapStatusPriorityNamePriorityDaysPriorityExposure
SR-01Not startedSmallOpenPriority 130Exposed now
SR-02PlannedMediumIn progressPriority 290Exposed on request
GV-01In placeLargeDonePriority 3180Improvement
GV-02OperatingWithdrawn
GV-03Not applicable
RM-aNot applicable

RM-b

RM-c

RM-d

RM-e

RM-f

RM-g

RM-h

RM-i

RM-j

IR-01

SV-01

Definitions

Definitions

TermMeaning in this workbook
GapA readiness item below Operating at the latest self-assessment, and the work that brings it there.
Blocking gapA duty NIS2 places on the entity directly (registration, the management body's duties, one of the ten measures, incident reporting) that is not yet in place at all.
Priority 1: Exposed nowA blocking gap: a duty NIS2 places on the entity directly is not in place at all. Due within 30 calendar days of the date raised, or by an earlier date a plan already set.
Priority 2: Exposed on requestA blocking item that is in place but not operating: a request for evidence of implementation (Article 32(2)(g), Article 33(2)(f)) would find it incomplete. Due within 90 calendar days of the date raised, or by an earlier date a plan already set.
Priority 3: ImprovementAny other item below Operating. Due within 180 calendar days of the date raised, or by an earlier date a plan already set.
Status: OpenAgreed, not started.
Status: In progressWork started; due date unchanged.
Status: DoneThe change is made and its record is filed; the item is re-rated at the next assessment.
Status: WithdrawnDropped, with the management body's recorded reason.
Effort: SmallUnder [[2]] weeks of work, inside one team, within budget.
Effort: Medium[[2]] to [[8]] weeks, or two or more teams, within budget.
Effort: LargeMore than [[8]] weeks, or money the budget does not hold.
Field: Gap IDGAP-nn
Field: Readiness itemThe A04 item it comes from
Field: What is missingFact, not opinion
Field: PriorityCalculated from the item's blocking flag and its level when raised
Field: Change that closes itThe document, control or record it adds or changes
Field: OwnerOne role
Field: EffortSmall, Medium or Large
Field: RaisedDate of the assessment
Field: DueThe priority's deadline, or an earlier planned date
Field: StatusOpen, In progress, Done or Withdrawn
Field: DoneDate the change was made
Field: EvidenceWhere the record is, for the evidence checklist
Readiness levelHow far one requirement has got: Not started, Planned, In place or Operating; or Not applicable, with the reason recorded. Levels are words, never a score.
Level: Not startedNothing exists yet.
Level: PlannedOwner and approach agreed; not yet in place.
Level: In placeDocumented and working, but incomplete, short of its own target, or with too little record for a supervisor to sample.
Level: OperatingWorking in full and meeting its own target, with records a supervisor could sample.
Level: Not applicableThe duty does not apply to the entity. The reason must be recorded, and confirmed with counsel.
OverdueA gap Open or In progress whose due date is before the As-at date.
Supervisory evidenceThe documents and records a competent authority may ask for: documented cybersecurity policies and evidence that they are implemented (Article 32(2) and Article 33(2)).
NR-01 to NR-12The rules of this pack. NR-09 and NR-10 are quoted on the Instructions sheet.
EXAMPLEA worked example: a wholesale distributor with about 900 staff, three warehouses and an online ordering service that takes 60% of its orders, as at 2026-09-30. Delete the EXAMPLE rows before approval.

Framework References

Framework references

These references indicate relevance only and do not reproduce the text of any standard.

FrameworkReferenceSupported by
ISO/IEC 27001:2022Clause 10.2 — Nonconformity and corrective actionGaps: each nonconformity corrected, with its cause, the change and the record
NIST CSF 2.0ID.IM-01 — “Improvements are identified from evaluations”The tracker: improvements identified from the self-assessment, owned and dated
NIS2 — Directive (EU) 2022/2555Article 21(4) — an entity that finds that it does not comply with the measures in paragraph 2 takes, “without undue delay, all necessary, appropriate and proportionate corrective measures”The tracker as a whole: every gap corrected without undue delay, with an owner and a due date
NIS2 — Directive (EU) 2022/2555Article 32(7) — enforcement takes account of the seriousness of the infringement, where serious infringements include repeated violations, “a failure to notify or remedy significant incidents”, a failure to remedy deficiencies following binding instructions, obstruction of audits, and false or grossly inaccurate information about the Article 21 measures or Article 23 reporting; and of its duration, earlier infringements, damage, intent or negligence, mitigation, certification and cooperationPriority: a duty not met at all first, as a supervisor weighs it
NIS2 — Directive (EU) 2022/2555Article 33(1) — for important entities, the competent authorities act, where necessary, through ex post supervisory measures when given evidence, indication or information that the entity allegedly does not comply, in particular with Articles 21 and 23Priority 2: gaps a supervisor of an important entity would find when acting on evidence or an indication
NIS2 — Directive (EU) 2022/2555Article 33(5) — “Article 32(6), (7) and (8) shall apply mutatis mutandis” to important entitiesThe Summary: the same seriousness and accountability apply to important entities

Editions referenced: Directive (EU) 2022/2555 (NIS2); Commission Recommendation 2003/361/EC; Implementing Regulation (EU) 2024/2690; ISO/IEC 27001:2022 incl. Amd 1:2024; NIST CSF 2.0

ISO/IEC 27001 references name the clause or control this document relates to. They do not say that meeting it meets any NIS2 requirement.

Prepared by Zero One Cybersecurity · Published by CISO Times

CISO Times Resource Licence — Internal Use